T e modular design allows for a quick cleanroom installation as components are pre-engineered off site. T e panels are FM rated and built with a honeycomb construction that makes them extremely strong and therefore ideal for high rooms.” When asked to provide an example of a laboratory that’s benefi ted from his company’s cleanroom options, Cressey recalls a recent project for a


university featuring the fi rm’s Hardwall solution. “T is involved a 7.74m2 UV-fi ltered Hardwall to be used to protect a light-sensitive process. Our client, a building services company, required an ISO Class 5 cleanroom for its redbrick university client. T e project specifi cation also stipulated a change area for good gowning practice, UV-proof panels and a hatch for goods transfer.


C New cleanroom facility


lean Room Construction (CRC) has secured a multimillion-pound contract to design and build a new cleanroom facility for specialist pharmaceutical


manufacturer, Aspar Pharmaceuticals. The new 3,800m2 purpose-built facility in St Albans, Hertfordshire will replace Aspar’s smaller existing tablet manufacturing premises in Colindale, London and will provide Good Manufacturing Practice-compliant facilities. Kent-based CRC has been appointed as the lead principal contractor with responsibility for the full turnkey design, build, commissioning and validation package and will start work before the end of 2015.


Aspar Pharmaceuticals is a major supplier of analgesics to the pharmacy and grocery sectors across the UK. CRC Projects Director, Richard Rowe, comments: “Clean Room Construction has a successful track record of engineering and delivering fi rst class cleanroom facilities right across the science and tech- nology sectors. We are delighted to have secured this major pharmaceutical manufacturing contract and we look forward to delivering a facility of which we can all be proud.”


www.scientistlive.com


“We worked closely with our client to maximise on the footprint of the cleanroom, despite the installation area having an irregular layout. We designed the cleanroom to have an inset on one corner to accommodate trunking in the existing room, making it be a perfect fi t.”


Clean air for cleanrooms Another UK-headquartered leader in cleanroom kit is Monmouth Scientifi c. T e fi rm designs and manufactures a large range of clean air technology equipment. T e company’s key news from 2015 is the launch of a new microbiological safety


“The modular design allows for a quick cleanroom installation as components are pre- engineered off site”


Andrew Cressey, Connect 2 Cleanrooms


Above: Example of a Hardwall cleanroom from Connect 2 Cleanrooms


Below: Terra manufactures glove boxes for use in cleanrooms and labs


Page 1  |  Page 2  |  Page 3  |  Page 4  |  Page 5  |  Page 6  |  Page 7  |  Page 8  |  Page 9  |  Page 10  |  Page 11  |  Page 12  |  Page 13  |  Page 14  |  Page 15  |  Page 16  |  Page 17  |  Page 18  |  Page 19  |  Page 20  |  Page 21  |  Page 22  |  Page 23  |  Page 24  |  Page 25  |  Page 26  |  Page 27  |  Page 28  |  Page 29  |  Page 30  |  Page 31  |  Page 32  |  Page 33  |  Page 34  |  Page 35  |  Page 36  |  Page 37  |  Page 38  |  Page 39  |  Page 40  |  Page 41  |  Page 42  |  Page 43  |  Page 44  |  Page 45  |  Page 46  |  Page 47  |  Page 48  |  Page 49  |  Page 50  |  Page 51  |  Page 52  |  Page 53  |  Page 54  |  Page 55  |  Page 56  |  Page 57  |  Page 58  |  Page 59  |  Page 60  |  Page 61  |  Page 62  |  Page 63  |  Page 64  |  Page 65  |  Page 66  |  Page 67  |  Page 68  |  Page 69  |  Page 70  |  Page 71  |  Page 72  |  Page 73  |  Page 74  |  Page 75  |  Page 76  |  Page 77  |  Page 78  |  Page 79  |  Page 80  |  Page 81  |  Page 82  |  Page 83  |  Page 84  |  Page 85  |  Page 86  |  Page 87  |  Page 88  |  Page 89  |  Page 90  |  Page 91  |  Page 92  |  Page 93  |  Page 94  |  Page 95  |  Page 96  |  Page 97  |  Page 98  |  Page 99  |  Page 100