Gujarat Power Corporation Limited Gujarat Solar Park
GUJARAT POWER CORPORATION LIMITED (GPCL) is the Nodal Agency for the development of “Solar Park” in Gujarat. Govt of Gujarat has taken proactive initiative in the Projects of Renewable energy to harness Clean and Green Energy. GPCL commissioned, Asia’s largest “Gujarat Solar Park” to mitigate impact of Climate Change and to protect environment for our future generation.
The 590 MW capacity of “Solar Park” is located at village Charanka, District Patan in Gujarat spread across 5,384 acres of unused land. The integrated “Solar Park” has state of art infrastructure with provision to harness rain water besides power evacuation. Installed capacity of 224MW Solar Project has been commissioned by 20 developers.
The capacity will be enhanced by another 50MW by the end of this year, thus putting the installed capacity as 274MW., accounting to 25% of total Solar generation developed India. Solar Park has also capacity to generate 100 MW of
Development cost of “Solar Park” was Rs. 4500 Crores, which includes Rs. 550 Crores for infrastructure and land acquisition and Rs. 3,996 crores for Solar Power Plant (Developers investment), besides creating an Employment for more than 1,000 people on permanent basis.
“Gujarat Solar Park” has been one of the most innovative projects in the Solar Energy Sector having large concentration/ cluster of Solar Power generating units at single location, thereby reducing cost substantially (40%), and bringing down lower Solar Tariff to pave way for large scale development of Solar Power Projects.
Martifer Solar Grid Parity with IKEA
Martifer Solar has delivered one of the first unsubsidized solar power plants in Italy for the Ikea Group on the rooftop of a new commercial store in Pisa Tuscany. The project has a total capacity of 696.15 kW and has been structured without relying on any government subsidies or feed-in- tariff approach.
The power generation from this PV project will be at a Levelized Cost of Electricity (LCoE which is equal to or less than the price of electricity being sold from the grid. Martifer Solar was responsible for the EPC (engineering procurement and construction) of this solar plant and will be responsible for the subsequent Operation
Project was launched on 30.12.2010 and commissioned on 31.12.2011 and formally dedicated to the Nation by Hon’ble Chief Minister on 19.04.2012.
and Maintenance (O&M) service. The grid parity project with approximately 2700 modules installed on fixed structures will produce the equivalent amount of electricity for nearly 800 inhabitants and will avoid 373 tons of CO2 emissions per year. With this recently installed PV project for IKEA Martifer Solar is showing that grid parity is a reality and will be a growing trend in the future of maturing.
Power Clouds Project
Power Clouds Pte Ltd introduces an innovative solution for the development of photovoltaic through the direct and bottom-up involvement of the people. Anyone is free to buy a solar panel (Power Units and rent it out to the company contributing to the production of green energy that protects the planet. The same company carries out the plants and ensure through an extensive network of activities including energy production a fixed monthly income for 20 years for those who take part in the project. The concept behind Power Clouds is seen as an alternative to traditional financing ways for the photovoltaic stations construction and at the same time leads to the direct involvement of a large number of people (40000 participants in the first year.
We are the only company which develops and manufactures large photovoltaic projects involving ordinary people who care for the environment and through the initiative they are able to get a fair economic benefit.
Issue IV 2014 I
www.solar-international.net 37
Page 1 |
Page 2 |
Page 3 |
Page 4 |
Page 5 |
Page 6 |
Page 7 |
Page 8 |
Page 9 |
Page 10 |
Page 11 |
Page 12 |
Page 13 |
Page 14 |
Page 15 |
Page 16 |
Page 17 |
Page 18 |
Page 19 |
Page 20 |
Page 21 |
Page 22 |
Page 23 |
Page 24 |
Page 25 |
Page 26 |
Page 27 |
Page 28 |
Page 29 |
Page 30 |
Page 31 |
Page 32 |
Page 33 |
Page 34 |
Page 35 |
Page 36 |
Page 37 |
Page 38 |
Page 39 |
Page 40 |
Page 41 |
Page 42 |
Page 43 |
Page 44 |
Page 45 |
Page 46 |
Page 47 |
Page 48 |
Page 49 |
Page 50 |
Page 51 |
Page 52 |
Page 53 |
Page 54 |
Page 55 |
Page 56 |
Page 57 |
Page 58 |
Page 59 |
Page 60 |
Page 61 |
Page 62 |
Page 63 |
Page 64 |
Page 65 |
Page 66 |
Page 67 |
Page 68 |
Page 69 |
Page 70 |
Page 71 |
Page 72 |
Page 73 |
Page 74 |
Page 75 |
Page 76 |
Page 77 |
Page 78 |
Page 79 |
Page 80 |
Page 81 |
Page 82 |
Page 83 |
Page 84 |
Page 85 |
Page 86 |
Page 87 |
Page 88 |
Page 89 |
Page 90 |
Page 91 |
Page 92 |
Page 93 |
Page 94 |
Page 95 |
Page 96