PROTECTING AIRPORTS against the risk of flooding


Tom Sperrey, managing director of UPS Systems, explains how standby power is playing a vital role in the efficient operation of Birmingham Airport


E


ven the best made contingency plans can be prone to failure. The flood risk


assessment at Gatwick Airport failed to foresee the unprecedented rainfall it experienced on 23rd December last year, when more rain fell on that one day (68mm) than had done for the whole of the month. This led the airport’s chief executive Stewart Wingate to describe it as, “…the worst flooding in the airport’s living memory.” The winter of 2013/-14 was reported


as the wettest in modern times in southern England. River and water tables were already high due to heavy rainfall throughout December. Consequently, during the early hours of Christmas Eve, three airfield sub- stations flooded as the nearby River Mole burst its banks. Water later poured through power cable conduits into electrical switch rooms in the North Terminal, which in turn knocked out vital electrical equipment. This had dire consequences and caused chaotic scenes in the airport’s passenger terminals as departure boards and check-in desks failed. This meant that almost a third of all flights scheduled to depart on Christmas Eve were cancelled, affecting over 11,000 passengers. Following a cross-party parliamentary enquiry by a select Transport Committee, a report recommended that the Civil Aviation Authority (CAA) oversees operational resilience issues at both Heathrow and Gatwick airports, and ensures that contingency plans are well developed, shared and tested with all other relevant parties. Airports across the UK have been urgently reviewing their contingency and business continuity plans following the Gatwick flood. UPS Systems has been working with a number of UK airports, including Birmingham, Stansted and Luton, to help ensure that, in the event of a major power outage on the electricity grid, operations continue with the help of back-up power systems - or uninterruptible power supplies (UPS).


Below: Birmingham Airport is currently the UK’s seventh busiest airport, handling over nine million passengers in 2013


UPS units to provide back-up power for the airport’s various IT systems. He said, “We operate a busy 24/7 airport


so down-time simply isn’t an option. BHX is dependent on the reliability of its IT systems so we take great care when it comes to specifying a UPS system. Power interruptions could have a negative impact on the business and on the airport’s reputation. UPS Systems supplied and installed six units of various capacities with ratings from 10-60kVA. The standby power units are used as primary supply to critical equipment to prevent shutdown should we experience a mains failure to the site. We rely on these units to supply back-up power to check-in desks, security equipment, CCTV and flight information


BUSY BHX Located south east of the city centre, Birmingham Airport is currently the UK’s seventh busiest airport, handling over nine million passengers in 2013. More than 750,000 passengers used the Midlands terminal in April 2014, making it a record month in the airport’s history. Birmingham Airport, or BHX to give it its international location identifier, offers a base for airlines such as Flybe, Monarch, Ryanair and Thomas Cook Airlines. With over £300m invested in the Airport over the past ten years, Birmingham now boasts world class facilities and state of the art infrastructure, including a newly extended runway, which means aircraft can fly further, bringing new long haul destinations within direct range for the first time. With this many passengers to look


after, Birmingham Airport takes its responsibility for business continuity very seriously and has recently taken additional security measures to ensure operational services remain secure and online at all times. For the past eight years, UPS Systems


has been working with Birmingham Airport, providing comprehensive service contracts and supplying it with over 40 standby power systems for critical IT, check-in desks and customer facing communication systems. Mohammed Benyahia is an electrical


engineer with Engineering Services, Birmingham Airport. His role is to specify


/ ELECTRICALENGINEERING


display systems (FIDS). We’ve been working with UPS Systems for several years simply because of its reliability, technical expertise and the quality of its consultancy.”


SUMMARY Ensuring a reliable and a regularly maintained UPS system that is fully BS 7671 compliant, should be just one element of a carefully thought out contingency plan. Recent extreme weather conditions and the impact of flooding demonstrated just how vulnerable facilities can be. The location of switch rooms, switchgear and power protection equipment should also be factored in as resilience issues when reviewing business continuity plans. UPS Systems offers advice to contingency planning committees and can provide critical circuit design for high availability systems.


UPS Systems www.upssystems.co.uk T: 01488 680 500


Enter 209 ELECTRICAL ENGINEERING | JUNE 2014 23


Page 1  |  Page 2  |  Page 3  |  Page 4  |  Page 5  |  Page 6  |  Page 7  |  Page 8  |  Page 9  |  Page 10  |  Page 11  |  Page 12  |  Page 13  |  Page 14  |  Page 15  |  Page 16  |  Page 17  |  Page 18  |  Page 19  |  Page 20  |  Page 21  |  Page 22  |  Page 23  |  Page 24  |  Page 25  |  Page 26  |  Page 27  |  Page 28  |  Page 29  |  Page 30  |  Page 31  |  Page 32  |  Page 33  |  Page 34  |  Page 35  |  Page 36  |  Page 37  |  Page 38  |  Page 39  |  Page 40  |  Page 41  |  Page 42  |  Page 43  |  Page 44  |  Page 45  |  Page 46  |  Page 47  |  Page 48  |  Page 49  |  Page 50  |  Page 51  |  Page 52  |  Page 53  |  Page 54  |  Page 55  |  Page 56  |  Page 57  |  Page 58  |  Page 59  |  Page 60  |  Page 61  |  Page 62  |  Page 63  |  Page 64