This page contains a Flash digital edition of a book.
currents ■ Bill Payment Options


There’s more than one way to pay your electric bill


A Safe Investment


A storm shelter paid off for this man, who survived the deadly EF-5 tornado that devestated Joplin. The storm on May 22, 2011 flattened portions of the city and killed 158 people.


Get Ready For Stormy Weather


CEC storm shelters are lifesavers—and they’re affordable. persons. Prices start at $2,775 and includes delivery and installation.


Jennifer Boling, coordinator of Choctaw Electric’s storm shelter loan program, says now is the time to place your order for a new in-ground storm shelter.


I


“Every year we see an increase in the number of loan applications and installations,” Boling said. “After the Moore tornado last year the phone never stopped ringing.”


As the weather warms and storm season kicks in, the installation list grows rapidly. Boling encourages members to place their order as soon as possible.


CEC storm shelter loans pay for the cost of the storm shelter, installation and delivery. Financing is available for up to 72 months at six percent interest, making monthly payments extremely affordable; in some cases, as low as $46 a month. To make it even easier, loan payments are itemized on your monthly electric bill.


CEC offers two types of storm shelters: •


Manufactured in-ground shelter


• Poured-in-place, solid concrete in- ground storm shelters


All models are available in a variety of sizes with seating capacity up to 20


This poured-in-place storm shelter is one of the models available from Choctaw Electric. This particular style offers safety features such as double handrails on steps, gas operated doors, wind turbines and vents. It can also be customized with your choice of paint color.


t’s a rare spring that doesn’t bring severe storms and tornadoes to Oklahoma. If you’re serious about staying safe,


The shelters include safety features such as double handrails, gas-operated doors, wind turbines, and vents. Some models can be customized with your choice of paint color. All come with a manufacturer’s warranty against certain defects such as leaks.


If a storm shelter is on your wish list, please visit the CEC website at www. choctawelectric.coop for more details, or call Jennifer Boling at 800-780-6486, ext. 207.


Choctaw Electric Cooperative (CEC) provides several convenient bill payment options and payment plans. For more details on any of our payment options, please contact your CEC billing representative at 800-780-6486, or visit www.choctawelectric.coop.


Pay online at www.choctawelectric.coop. Using our secure payment site you can also view your account history, check your account balance, energy usage and more.


Budget Billing. With this option your energy usage is averaged over 12 months, helping you avoid seasonal high bills .


Automatic Payment Plan. Monthly bill payments are automatically withdrawn from your checking, savings, or credit card account.


Prepaid Billing. This plan lets you pay ahead for your electricity. Requires an energy purchase of $50 to begin. No late penalties or disconnect/reconnect fees.


After Hours Payments. Choctaw Electric offers a drive through window and/or payment drop box at CEC office locations in Hugo, Idabel and Antlers.


Authorized Payment Locations. Pay your bill at any of the following locations Monday through Friday during regular office hours.


• • • • • • • • • • • • • • • • •


First Bank & Trust, Idabel


McCurtain Co. National Bank, Idabel Choctaw Electric Cooperative, Idabel Idabel National Bank, Idabel First Bank, Antlers


Ameri State Bank, Antlers


Choctaw Electric Cooperative, Antlers First National Bank, Broken Bow First Bank and Trust, Broken Bow McCurtain Co. National Bank, Broken Bow Shamrock Bank, Clayton


Choctaw Electric Cooperative, Hugo First Bank, Hugo


First Bank and Trust, Hochatown First State Bank, Valliant


McCurtain Co. National Bank, Valliant First Bank and Trust, Wright City


inside•your•co-op | 5


Page 1  |  Page 2  |  Page 3  |  Page 4  |  Page 5  |  Page 6  |  Page 7  |  Page 8  |  Page 9  |  Page 10  |  Page 11  |  Page 12  |  Page 13  |  Page 14  |  Page 15  |  Page 16  |  Page 17  |  Page 18  |  Page 19  |  Page 20  |  Page 21  |  Page 22  |  Page 23  |  Page 24  |  Page 25  |  Page 26  |  Page 27  |  Page 28  |  Page 29  |  Page 30  |  Page 31  |  Page 32  |  Page 33  |  Page 34  |  Page 35  |  Page 36  |  Page 37  |  Page 38  |  Page 39  |  Page 40  |  Page 41  |  Page 42  |  Page 43  |  Page 44  |  Page 45  |  Page 46  |  Page 47  |  Page 48  |  Page 49  |  Page 50  |  Page 51  |  Page 52  |  Page 53  |  Page 54  |  Page 55  |  Page 56  |  Page 57  |  Page 58  |  Page 59  |  Page 60  |  Page 61  |  Page 62  |  Page 63  |  Page 64  |  Page 65  |  Page 66  |  Page 67  |  Page 68  |  Page 69  |  Page 70  |  Page 71  |  Page 72  |  Page 73  |  Page 74  |  Page 75  |  Page 76  |  Page 77  |  Page 78  |  Page 79  |  Page 80  |  Page 81  |  Page 82  |  Page 83  |  Page 84  |  Page 85  |  Page 86  |  Page 87  |  Page 88  |  Page 89  |  Page 90  |  Page 91  |  Page 92  |  Page 93  |  Page 94  |  Page 95  |  Page 96  |  Page 97  |  Page 98  |  Page 99  |  Page 100  |  Page 101  |  Page 102  |  Page 103  |  Page 104  |  Page 105  |  Page 106  |  Page 107  |  Page 108  |  Page 109  |  Page 110  |  Page 111  |  Page 112  |  Page 113  |  Page 114  |  Page 115  |  Page 116  |  Page 117  |  Page 118  |  Page 119  |  Page 120  |  Page 121  |  Page 122  |  Page 123  |  Page 124  |  Page 125  |  Page 126  |  Page 127  |  Page 128  |  Page 129  |  Page 130  |  Page 131  |  Page 132  |  Page 133  |  Page 134  |  Page 135  |  Page 136  |  Page 137  |  Page 138  |  Page 139  |  Page 140  |  Page 141  |  Page 142  |  Page 143  |  Page 144  |  Page 145  |  Page 146  |  Page 147  |  Page 148  |  Page 149  |  Page 150  |  Page 151  |  Page 152  |  Page 153  |  Page 154  |  Page 155  |  Page 156