Business profile design services. URS is solutions to reduce the cost of


electrification by more than 50 per cent. This design and build project was delivered in the space of just six months, where typically this type of work would take a year. Close collaborative working between


Network Rail, Babcock Rail and URS was a major factor in the successful delivery of the project. ‘By working closely and collaboratively with clients from the beginning, URS is able to take on the role of a trusted advisor, identifying the client’s strategy and business drivers in order to help it deliver a valued service to its customers, as well as delivering tangible benefits for its stakeholders and bottom-line improvements,’ explains Ian.


North Doncaster Chord


URS is in the final stages of completing the design works for this new diversionary route that will take slow- moving freight trains away from the East Coast Main Line. Working for Morgan Sindall, URS has designed a new viaduct, two new bridges, 1.2 km of new permanent way and connections into existing network rail infrastructure, as well as supporting mechanical and electrical overhead line electrification and telecoms alterations.


URS has also provided essential environmental and ecological input into the design in order to minimise the impact of the works on the environment, local ecology and residents.


National Switch and Crossing Renewals Programme


URS has been providing multidisciplinary design services for the detailed design of switch and crossing renewals for a number of years. The work has involved providing permanent way, signalling and telecoms, railway electrification and power engineering, as well as civil, structural and track-bed engineering


currently one of three consultants providing survey and detailed design services to Network Rail across the UK, with contracted works in the South East and West of England and in Scotland.


Borders Railway


URS is providing outline design services to BAM Nuttall following a long association with the project. The project is now entering the detailed design phase, with construction due to start in early 2013. URS is also providing Network Rail with mining stabilisation design work.


High Speed 2


URS has partnered with Mott McDonald to provide multidisciplinary design development services to HS2, specifically for the Metropolitan section between Euston and Old Oak Common. It is also currently providing outline designs for future parliamentary submission. This commission will run until the autumn of 2013.


Crossrail


URS has been involved at various stages of the project since the early 1990s, including route selection, providing support for the parliamentary Hybrid Bill, which received Royal Assent in July 2008, as well as preliminary and detailed design work.


Since 2008, URS has been one of the largest design consultants on Crossrail and at peak had 500 staff working on both the surface routes and the central section. Services provided by URS encompass feasibility studies, outline and detailed design of the scheme’s infrastructure, including stations, portals, civil engineering structures and track layouts, as well as passenger service operational modelling, pedestrian flow modelling and transport planning services. URS has also worked for Network Rail on the surface routes to the West and North East of the capital and for Crossrail on the central (underground) section, while also supporting a number of other consultants on the central section.


FEBRUARY 2013 PAGE 87


Recruiting at all levels To meet the future demands of the rail industry, URS is currently recruiting at all levels and in all disciplines, particularly in London and the South East. It is offering candidates the opportunity to work on some of the most iconic projects, both in the UK and around the world. ‘Recognising the resource challenges facing the industry, we are investing in the future with a balanced intake of graduates and apprentices to grow the engineering talent of the future,’ says Ian. Throughout 2013 URS will seek to build on the successes of the past eighteen months. ‘We will continue to identify and deliver solutions that will provide our contractor client base with best value,’ says Ian. ‘By consistently developing innovative solutions for some of the world’s most complex engineering, construction and technical challenges, URS has become a market leader that clients trust and rely on. Through our consistently high benchmarking, outstanding quality service and proven sustainability programmes, our desire and capability to grow will be used to full potential.’


In addition, URS is looking to develop new service offerings in asset management and process engineering, as it seeks to maximise the life of existing assets. ‘2013 will be a challenging and exciting year, as we seek to grow our business and continue to build on our design and build portfolio,’ Ian concludes. For more information about URS visit www.ursglobal.com


Page 1  |  Page 2  |  Page 3  |  Page 4  |  Page 5  |  Page 6  |  Page 7  |  Page 8  |  Page 9  |  Page 10  |  Page 11  |  Page 12  |  Page 13  |  Page 14  |  Page 15  |  Page 16  |  Page 17  |  Page 18  |  Page 19  |  Page 20  |  Page 21  |  Page 22  |  Page 23  |  Page 24  |  Page 25  |  Page 26  |  Page 27  |  Page 28  |  Page 29  |  Page 30  |  Page 31  |  Page 32  |  Page 33  |  Page 34  |  Page 35  |  Page 36  |  Page 37  |  Page 38  |  Page 39  |  Page 40  |  Page 41  |  Page 42  |  Page 43  |  Page 44  |  Page 45  |  Page 46  |  Page 47  |  Page 48  |  Page 49  |  Page 50  |  Page 51  |  Page 52  |  Page 53  |  Page 54  |  Page 55  |  Page 56  |  Page 57  |  Page 58  |  Page 59  |  Page 60  |  Page 61  |  Page 62  |  Page 63  |  Page 64  |  Page 65  |  Page 66  |  Page 67  |  Page 68  |  Page 69  |  Page 70  |  Page 71  |  Page 72  |  Page 73  |  Page 74  |  Page 75  |  Page 76  |  Page 77  |  Page 78  |  Page 79  |  Page 80  |  Page 81  |  Page 82  |  Page 83  |  Page 84  |  Page 85  |  Page 86  |  Page 87  |  Page 88  |  Page 89  |  Page 90  |  Page 91  |  Page 92  |  Page 93  |  Page 94  |  Page 95  |  Page 96  |  Page 97  |  Page 98  |  Page 99  |  Page 100