At HBPW we understand that our clients all have unique and complex needs. We strive to add real value to our clients through a blend of professional civil and structural engineering skills, effective communication and a deep commitment to providing excellent customer service. By linking into the latest IT technologies,
Structural Eurocodes, engineering innovation and cultural trends, we have been able to provide some truly innovative solutions to meet both national
and regional challenges across the UK. We have provided civil engineering and
building consultancy services to a range of diverse clients ranging from major national and international businesses to local regional companies. HBPW has considerable experience of designing and working in the railway environment and are familiar with Network Rail approval procedures standards and details.
www.hbpw.co.uk
The No.1 company solely dedicated to Drainage on the Rail Infrastructure
Looking for Rail Industry leading condition monitoring services?
Why not take advantage of the only laboratory in Europe accredited by BINDT* to train rail
engineers in oil analysis to ISO18436 *British Institute of Non Destructive Testing
Maximise your
Experts in everything we test………….
possession...
UKAS Accredited to ISO 17025 Oil & Machine Condition Monitoring analysis
Please contact us at Tel: 01492 574750
E:
oillab@alcontrol.com www.alcontrol.com
RAIL PLANT ASSOCIATION LTD Independent Oil & Fuel Analysis Laboratory
Call us TODAY to discuss your requirements on 01785 665909 email
completedrainclearance@yahoo.co.uk or visit our website
www.completedrainclearance.co.uk
With: Site Inspection before job commences to identify hazzards etc. Working vehicles are low-loaded to site, no breakdowns and a cost saving to you Quick on/off-tracking with our purpose-built 4 wheel drive vehicles 3,500 Cu M/min. air mover capable of emptying catch pits in seconds 1,500 psi high pressure water pump provides continuous flow for flushing drains etc 850 gallon water tank means less top-ups (if any) during the shift 4 tonne capacity detritus tank A fully trained 3 man crew complete with maintenance fitter ensuring no breakdowns or loss of time
Page 1 |
Page 2 |
Page 3 |
Page 4 |
Page 5 |
Page 6 |
Page 7 |
Page 8 |
Page 9 |
Page 10 |
Page 11 |
Page 12 |
Page 13 |
Page 14 |
Page 15 |
Page 16 |
Page 17 |
Page 18 |
Page 19 |
Page 20 |
Page 21 |
Page 22 |
Page 23 |
Page 24 |
Page 25 |
Page 26 |
Page 27 |
Page 28 |
Page 29 |
Page 30 |
Page 31 |
Page 32 |
Page 33 |
Page 34 |
Page 35 |
Page 36 |
Page 37 |
Page 38 |
Page 39 |
Page 40 |
Page 41 |
Page 42 |
Page 43 |
Page 44 |
Page 45 |
Page 46 |
Page 47 |
Page 48 |
Page 49 |
Page 50 |
Page 51 |
Page 52 |
Page 53 |
Page 54 |
Page 55 |
Page 56 |
Page 57 |
Page 58 |
Page 59 |
Page 60 |
Page 61 |
Page 62 |
Page 63 |
Page 64 |
Page 65 |
Page 66 |
Page 67 |
Page 68 |
Page 69 |
Page 70 |
Page 71 |
Page 72 |
Page 73 |
Page 74 |
Page 75 |
Page 76 |
Page 77 |
Page 78 |
Page 79 |
Page 80 |
Page 81 |
Page 82 |
Page 83 |
Page 84 |
Page 85 |
Page 86 |
Page 87 |
Page 88 |
Page 89 |
Page 90 |
Page 91 |
Page 92 |
Page 93 |
Page 94 |
Page 95 |
Page 96 |
Page 97 |
Page 98 |
Page 99 |
Page 100