Feature Loading bays & doors


Distribution centre combines efficiency and performance


A leading high street fashion retailer with nearly 300 stores in the UK, Ireland and the rest of the world wanted to build a new distribution centre from which it control its logistical operations. The new 46,000 sq ft building needed to combine efficient distribution performance with low carbon emissions and impressive thermal insulation. Working together, sara Loading Bay Specialists and Kingspan Group were able to meet all of these requirements


T


he contract to construct the distrib- ution centre was awarded to Buckingham Group Contracting, demonstrating the company’s lead- ing position within the regional distrib- ution and retail sector. The project involved the design and build of two warehouses, accessed by 47 loading bays with dock levellers and six level accesses. One of the warehouses accom- modates the internal structure for a two- storey transport office and three-storey, high quality office accommodation. The retailer has made a public com- mitment to operating in a way that is mindful of the demand on the planet’s limited resources across all of its stores, offices and warehouses. To this end, it was specified that the new warehouses that make up the distribu- tion centre should be constructed with a BREEAM rating of ‘Excellent’ for the highest levels of long-term energy sav- ings and reductions in carbon emis- sions. BREEAM is the environmental assessment method for buildings around the world. It sets the standard for best practice in sustainable design and has become the de facto measure used to describe a building’s environ- mental performance. To meet these requirements, Buckingham Group Contracting turned to Kingspan Group and sara Loading Bay Specialists. Kingspan Group is the UK’s leading manufac- turer of sustainable products for the construction industry. The Group’s innovative products include insulated panels, rigid insulation boards, raised access floors, steel frame and timber frame off-site solutions, environmental and renewable fuel and water storage solutions, and hot water systems. Kingspan specified and supplied insulated wall and roof panels for the construction, playing a vital role in meeting the required BREEAM rating. Importantly, the panels are all fire safe,


S8


ensuring that a high level of safety goes hand in hand with the insulation performance. The single component, pre-engineered panels require only a single fix and thus reduce build time. With no cavities, gaps, cold bridges or interstitial condensation risk, the panels offer low air leakage of 5m3/hr/m2 or better and reliable ther- mal performance.


The contract to equip the loading bays went to sara, which supplied a complete package comprising doors, sealing pods, dock levellers, traffic lights and access shelters. Sara worked with Buckingham Group Contracting and Kingspan throughout the design and build stages to ensure the right equipment was specified for the job and that it would fit perfectly with the Kingspan panels. The close partner- ship even extended to making sure that the doors colour-coordinated with the wall panels for a pleasing overall aesthetic appearance. With 47 loading bays, it was also important the warehouse doors should be properly insulated to give the same thermal performance as the roof and wall panels. sara specified thermally insulated sectional overhead doors that are constructed using Kingspan Insulated Door Panels. Their insulat- ing and Firesafe performance com- bines with highly efficient open/close


sara Loading Bay Specialists worked with Kingspan Group to build a new distribution centre for a high street fashion retailer. The project incorporated two warehouses accessed by 47 loading bays with dock levellers and six level accesses. The facility needed to combine thermal efficiency with impressive logistics performance


operation to further reduce heat loss. The efficiency theme continues with the automated dock levellers, which help to eliminate any bottlenecks for incoming and outgoing goods. The electro-hydraulic dock levellers are constructed from high tensile steel, with the platform using an 8mm Dubar non-skid steel plate. The levellers are supported by purpose-designed longi- tudinal angles hinging at the rear on pivot shafts made from St52 grade stainless steel. Sara dock loaders are designed, tested and manufactured to comply with BS EN 1398 with a full operational load capacity ranging from 3,000 to 11,000kg per single axle load. The dock shelters and seals also help to maintain efficiency and save energy costs. Sara dock shelters have two vertical side curtains and a hori- zontal head curtain attached with a special aerolastic wind guy system to maintain curtain positions. The cur- tains are constructed and machine stitched in heavy-duty 3mm thick PVC Derco. All fabrics are specially coated and are colourfast. With the warehouse construction completed and fitted out to the fashion retailer’s specifications, it has an impressive logistics facility from which it can service the whole of its network of stores. sara Loading Bay Specialists T: 01442 245577 www.saralbs.co.uk


Enter 351


MAY 2012 Materials Handling & Logistics


Page 1  |  Page 2  |  Page 3  |  Page 4  |  Page 5  |  Page 6  |  Page 7  |  Page 8  |  Page 9  |  Page 10  |  Page 11  |  Page 12  |  Page 13  |  Page 14  |  Page 15  |  Page 16  |  Page 17  |  Page 18  |  Page 19  |  Page 20  |  Page 21  |  Page 22  |  Page 23  |  Page 24  |  Page 25  |  Page 26  |  Page 27  |  Page 28  |  Page 29  |  Page 30  |  Page 31  |  Page 32  |  Page 33  |  Page 34  |  Page 35  |  Page 36  |  Page 37  |  Page 38  |  Page 39  |  Page 40  |  Page 41  |  Page 42  |  Page 43  |  Page 44  |  Page 45  |  Page 46  |  Page 47  |  Page 48  |  Page 49  |  Page 50  |  Page 51  |  Page 52  |  Page 53  |  Page 54  |  Page 55  |  Page 56  |  Page 57  |  Page 58  |  Page 59  |  Page 60  |  Page 61  |  Page 62  |  Page 63  |  Page 64  |  Page 65  |  Page 66  |  Page 67  |  Page 68  |  Page 69  |  Page 70  |  Page 71  |  Page 72  |  Page 73  |  Page 74  |  Page 75  |  Page 76  |  Page 77