This page contains a Flash digital edition of a book.
Company News IHS predicts gloomy DRAM returns


A DRAMATIC oversupply and freefalling prices are in store during the third quarter for the dynamic random access memory (DRAM) space, resulting in a turbulent second half for besieged DRAM suppliers, according to a new IHS iSuppli DRAM Market Brief from information and analysis provider IHS. The average selling price for Double Data Rate 3 (DDR) in the 2- gigabit (Gb) density—the bellwether DRAM product—is projected to drop to $1.60 in the third quarter, down 24 percent from $2.10 in the second quarter. The dive would be the biggest decline for the year, following a surprisingly solid second quarter during which pricing fell only 5 percent from the first quarter, as shown in the figure below. Moving into the fourth quarter, the price could plummet another 22 percent to $1.25—dangerously close to cash costs for many manufacturers. Only a year ago in the third quarter, pricing stood at $4.70.


“Contrary to typical seasonal


patterns in which prices are very soft during the second quarter, that period this year saw relatively flat, unchanged DRAM pricing compared to the first quarter,” said Mike Howard, principal analyst, DRAM and memory, at IHS. “However, companies did not capitalize on the healthy pricing levels to increase shipments in the second quarter— which, in retrospect, may have been the best time to do so.” DRAM manufacturers attribute the


low growth in shipments in the second quarter to two primary reasons: bloated inventory and challenges in transitioning to new process technologies. Taiwanese-based Nanya Technology Corp., for instance, had as much as 30 days of inventory when it started to throttle shipments, reflecting its challenges in getting material from factories into the hands of customers. For its part, South Korean Hynix Semiconductor Inc. indicated it suffered poor yields at the 38-nanometer process node, the result of ramping up


to a new process. And in the case of Idaho-based Micron Technology Inc., a large disparity between spot and contract prices in May—the company’s final fiscal month for the third quarter— prompted the firm to build inventory instead of selling into the spot market. Nonetheless, if trends in the past


are any indicator, DRAM companies not only will shift inventory rapidly but also will move quickly up the yield curve. As a result, the events of the second quarter won’t continue for long this year.


“The third quarter is shaping up to


be pretty bloody for DRAM makers,” Howard noted. “The combination of inventory reductions by DRAM makers and more bits coming out of the fabs is resulting in a very soft pricing environment.”


As much as a 15.9 percent increase in shipments is anticipated in the third quarter, and prices are not expected to firm up anytime soon because of that, IHS believes.


11


Pendulum Control Valves Series 65.0 / 65.1 for downstream pressure control


Efficient High wafer throughput and yield based on fast and accurate response


Compact Control and isolation valve with integrated control unit


Simple Easy to maintain


Series 65.1 with extended control range


Swiss Headquarters Tel ++41 81 771 61 61 CH@vatvalve.com


VAT Japan Tel (045) 333 11 44 JP@vatvalve.com


VAT Benelux Tel ++31 30 6018251 NL@vatvalve.com


VAT Korea Tel 031 662 68 56 KR@vatvalve.com


VAT France Tel 01 69 20 69 11 FR@vatvalve.com


VAT Taiwan Tel 03 516 90 88 TW@vatvalve.com


VAT Germany Tel (089) 46 50 15 DE@vatvalve.com


VAT China Tel 021 5854 4300 CN@vatvalve.com


VAT U.K. Tel 01926 452 753 UK@vatvalve.com


VAT Singapore Tel 0065 6252 5121 SG@vatvalve.com


VAT USA Tel (781) 935 1446 US@vatvalve.com


www.vatvalve.com


www.euroasiasemiconductor.com  Issue IV 2011


Page 1  |  Page 2  |  Page 3  |  Page 4  |  Page 5  |  Page 6  |  Page 7  |  Page 8  |  Page 9  |  Page 10  |  Page 11  |  Page 12  |  Page 13  |  Page 14  |  Page 15  |  Page 16  |  Page 17  |  Page 18  |  Page 19  |  Page 20  |  Page 21  |  Page 22  |  Page 23  |  Page 24  |  Page 25  |  Page 26  |  Page 27  |  Page 28  |  Page 29  |  Page 30  |  Page 31  |  Page 32  |  Page 33  |  Page 34  |  Page 35  |  Page 36  |  Page 37  |  Page 38  |  Page 39  |  Page 40