This book includes a plain text version that is designed for high accessibility. To use this version please follow this link.
11-08 :: August 2011


nanotimes


Companies Facts


listing will bolster Alexium’s presence in the world’s largest marketplace and give investors a broader opportunity to invest in a progressive technology company.


Alexium’s shares are already listed on the Australian Stock Exchange (ASX: AJX) and the Frankfurt Stock Exchange and XETRA electronic trading platform (AX:AJX).


http://www.alexiuminternational.com


weak to medium currents. Mass production com- mences in August 2011. The SDDH Series is a waterproof switch compatible with weak to medium currents between 10mA and 4.5A. Setting mechanical parts of contacts within a seamless casing, sealing with adhesive, and cove- ring the knob (the moving part) with rubber ensures excellent water resistance. Water resistance is IP68- equivalent, indicating the switch can even be opera- ted submerged in water. Insulation is improved with a 9.2mm pitch between tab terminals.


A


http://www.alps.com/products/e/npv_product/110805_ SDDH/SDDH_E.PDF


technologies and systems, reported financial results for the second quarter ended June 30, 2011.


A


Financial Highlights for the second quarter of 2011 compared to 2010:


ltair Nanotechnologies Inc. (NASDAQ: ALTI), a provider of advanced lithium-ion battery


LPS ELECTRIC has developed the SDDH Series waterproof switch, which is compatible with


• Revenues decreased to $0.5 million from $1.5m; • Gross margin of $(0.2) million compared to $0.4m; • Operating expenses of $3.8 million compared to $5.5 million;


• Net loss of $3.0 million compared to $4.9 million; • Year-to-date cash burn excluding financing activities of $9.1 million compared to $9.7 million.


“The second quarter was a very challenging period because of our severe cash constraints resulting from the delays in the Canon investment close; however, we did make progress in some key areas,” said Dr. Terry Copeland, Altairnano‘s president and chief executive officer. “We announced a three-year lease of our new 1.8 MW/ 300 kWh ALTI-ESS Advantage product, have made significant progress in getting the 10 MW INE frequency regulation project back on track and continue to make inroads in the various OEM industrial markets we have targeted.”


Altairnano‘s cash and cash equivalents decreased by $2.1 million, from $4.7 million at December 31, 2010 to $2.6 million at June 30, 2011.


Moreover, Altairnano has signed a contract with the Hawai‘i Natural Energy Institute (HNEI) of the University of Hawai‘i at Manoa to supply a one-megawatt ALTI-ESS energy storage system for a test of solar energy integration. Under the contract, Altairnano will provide the ALTI-ESS battery-based power management system to be tested on Hawaiian Electric‘s electric system to smooth the voltage and load profile with the aid of dynamic voltage controls and fast charge/discharge abilities.


“Altairnano technology was selected for this project based on its long cycle life and very rapid charge and


17


Page 1  |  Page 2  |  Page 3  |  Page 4  |  Page 5  |  Page 6  |  Page 7  |  Page 8  |  Page 9  |  Page 10  |  Page 11  |  Page 12  |  Page 13  |  Page 14  |  Page 15  |  Page 16  |  Page 17  |  Page 18  |  Page 19  |  Page 20  |  Page 21  |  Page 22  |  Page 23  |  Page 24  |  Page 25  |  Page 26  |  Page 27  |  Page 28  |  Page 29  |  Page 30  |  Page 31  |  Page 32  |  Page 33  |  Page 34  |  Page 35  |  Page 36  |  Page 37  |  Page 38  |  Page 39  |  Page 40  |  Page 41  |  Page 42  |  Page 43  |  Page 44  |  Page 45  |  Page 46  |  Page 47  |  Page 48  |  Page 49  |  Page 50  |  Page 51  |  Page 52  |  Page 53  |  Page 54  |  Page 55  |  Page 56  |  Page 57  |  Page 58  |  Page 59  |  Page 60  |  Page 61  |  Page 62  |  Page 63  |  Page 64  |  Page 65  |  Page 66  |  Page 67  |  Page 68  |  Page 69  |  Page 70  |  Page 71  |  Page 72  |  Page 73  |  Page 74  |  Page 75  |  Page 76  |  Page 77  |  Page 78  |  Page 79  |  Page 80  |  Page 81  |  Page 82  |  Page 83  |  Page 84  |  Page 85  |  Page 86  |  Page 87  |  Page 88  |  Page 89  |  Page 90  |  Page 91  |  Page 92  |  Page 93  |  Page 94  |  Page 95  |  Page 96  |  Page 97  |  Page 98  |  Page 99  |  Page 100  |  Page 101  |  Page 102  |  Page 103