Tensile Testing to Green Sand System Control (11-010)
3:45 PM Room: Utopia C
Effects of Hot Sand and Its Cure by Use of a Sand Cooler: A Case Study (11-059)
A Study of Erosion in Aeration Green Sand Molds with Various Alloys (11-034)
Computer Simulation of Blown Sand Molds (11-062)
Tursday, April 7 8:30 AM Room: Utopia D
A Systematic Approach to Veining Control (11-005)
Termal Expansion of Chemically Bonded Silica Sands (11-116)
Metal-Ceramic Shell Interactions During Investment Casting (11-077)
Friday, April 8 8:30 AM Room: Utopia C
Dimensional Changes in Chemically Bonded Molds and Cores (11-007)
Replacement of Phenol-Formaldehyde in Ure- thane Binders (11-117)
Comparing Casting Evaluation to Termal Dis- tortion Testing for Various Chemically Bonded Sand Systems Using Image Analysis (11-033)
STEEL
Tursday, April 7 2:00 PM Room: Utopia D
A Gage R&R Study of the ASTM A609 Ultra- sonic Testing Standard (11-029)
Determining Solidification Parameters of Alloy Steels (11-042)
Autonomous Optimization of a Solidification Pattern and its Effect on Porosity and Segrega- tion in Steel Castings (11-073)
3:45 PM Room: Utopia D
Role of Titanium on the Grain Refinement of 1030 Steel Castings (11-030)
Mechanical Properties of Cerium-Treated Fe- Mn-Al-C Steel Castings (11-035)
Calcium Wire Ladle Treatment to Improve Cleanliness of Centrifugal Cast Steel (11-037)
NEW AFS RESEARCH INITIATIVES
Tuesday, April 5 3:45 PM Room: Utopia D
PANEL: ALCS (Achieving Lightweight Cast- ing Solutions) Update
March 2011 MODERN CASTING | 49
INTERNATIONAL ISSUES
Friday, April 8 8:30 AM Room: Utopia D
Reshoring: Helping Your Customers Lean Teir Supply Chain
Te World Foundry Organization – A Global Partner
An Update on the Metal Castings Market of India
WORKSHOPS & SEMINARS
Wednesday, April 6 8:30 AM Room: Schaumburg EF
Refractory Coating Basics: More Tan Meets the Eye
8:30 AM Room: Schaumburg GH
Refractory Challenges for Today’s NonFerrous and Ferrous Induction Melting
3:45 PM Room: Schaumburg EF
Ductile Iron Castings - Te Problems You Could Have and How to Find Tem
Tursday, April 7 8:30 AM Room: Schaumburg EF
Time and Workload Management
2:00 PM Room: Schaumburg EF Conflict Management and Resolution
3:45 PM Room: Schaumburg EF
Safety Starts with Leadership
Page 1 |
Page 2 |
Page 3 |
Page 4 |
Page 5 |
Page 6 |
Page 7 |
Page 8 |
Page 9 |
Page 10 |
Page 11 |
Page 12 |
Page 13 |
Page 14 |
Page 15 |
Page 16 |
Page 17 |
Page 18 |
Page 19 |
Page 20 |
Page 21 |
Page 22 |
Page 23 |
Page 24 |
Page 25 |
Page 26 |
Page 27 |
Page 28 |
Page 29 |
Page 30 |
Page 31 |
Page 32 |
Page 33 |
Page 34 |
Page 35 |
Page 36 |
Page 37 |
Page 38 |
Page 39 |
Page 40 |
Page 41 |
Page 42 |
Page 43 |
Page 44 |
Page 45 |
Page 46 |
Page 47 |
Page 48 |
Page 49 |
Page 50 |
Page 51 |
Page 52 |
Page 53 |
Page 54 |
Page 55 |
Page 56 |
Page 57 |
Page 58 |
Page 59 |
Page 60 |
Page 61 |
Page 62 |
Page 63 |
Page 64 |
Page 65 |
Page 66 |
Page 67 |
Page 68 |
Page 69 |
Page 70 |
Page 71 |
Page 72 |
Page 73 |
Page 74 |
Page 75 |
Page 76 |
Page 77 |
Page 78 |
Page 79 |
Page 80 |
Page 81 |
Page 82 |
Page 83 |
Page 84