search.noResults

search.searching

dataCollection.invalidEmail
note.createNoteMessage

search.noResults

search.searching

orderForm.title

orderForm.productCode
orderForm.description
orderForm.quantity
orderForm.itemPrice
orderForm.price
orderForm.totalPrice
orderForm.deliveryDetails.billingAddress
orderForm.deliveryDetails.deliveryAddress
orderForm.noItems
Important Smoke Control Notice Product and System Safety Guidance


If you are involved in the ownership, management or fire safety approval of high rise buildings, or if you install AOVs and smoke control systems, take note of this important information from SE Controls.


Under the Regulatory Reform (Fire Safety) Order 2005, the building owner or manager is responsible for ensuring the smoke ventilation system is compliant. Compliance doesn’t just mean having a fire safety contract for a building, compliance is about providing a regulated building which is safe for occupation.


If a contractor is used to install or maintain the smoke ventilation system, they must be competent to provide evidence that the system is compliant, and therefore safe. Below are some key things to look out for.


EN 12101


Under the mandatory Construction Product Regulation products MUST carry a Declaration of Performance (DoP) where a harmonised standard exists. The following EN 12101 series of harmonised standards apply to smoke ventilation products and must be met.


• EN12101 Part 1 Specification for smoke barriers • EN12101 Part 2 Natural smoke and heat exhaust ventilators • EN12101 Part 3 Specification for powered smoke and heat exhaust ventilators • EN12101 Part 8 Smoke control dampers • EN12101 Part 10 Power supplies


These standards often have specific requirements relating to installation or testing practice. For example, EN 12101: Part 2 dictates that unless the actuator and vent profile are tested together as a system, in a fire environment and at an accredited facility, it is not compliant; therefore its safety can’t be guaranteed and a DoP cannot be issued.


BS7346-8 Code of Practice


BS7346-8 summarises the entire process from design, installation, commissioning and maintenance of the system.


Approved Document B


Approved Document B (ADB) provides guidance on complying with the building regulations with regards to means of escape, travel distances, vent locations, free area calculations, access and limiting fire spread.


BS9999 and BS9991


These standards cover fire safety in the design, management and use of non-residential and residential buildings respectively.


SE Controls is a member of the Smoke Control Association. If you want to check that the system you have is fit for purpose contact SE Controls for further information.


+44 (0)1543 443060 sales@secontrols.com www.secontrols.com


Find us on


Page 1  |  Page 2  |  Page 3  |  Page 4  |  Page 5  |  Page 6  |  Page 7  |  Page 8  |  Page 9  |  Page 10  |  Page 11  |  Page 12  |  Page 13  |  Page 14  |  Page 15  |  Page 16  |  Page 17  |  Page 18  |  Page 19  |  Page 20  |  Page 21  |  Page 22  |  Page 23  |  Page 24  |  Page 25  |  Page 26  |  Page 27  |  Page 28  |  Page 29  |  Page 30  |  Page 31  |  Page 32  |  Page 33  |  Page 34  |  Page 35  |  Page 36  |  Page 37  |  Page 38  |  Page 39  |  Page 40  |  Page 41  |  Page 42  |  Page 43  |  Page 44  |  Page 45  |  Page 46  |  Page 47  |  Page 48  |  Page 49  |  Page 50  |  Page 51  |  Page 52  |  Page 53  |  Page 54  |  Page 55  |  Page 56  |  Page 57  |  Page 58  |  Page 59  |  Page 60