search.noResults

search.searching

saml.title
dataCollection.invalidEmail
note.createNoteMessage

search.noResults

search.searching

orderForm.title

orderForm.productCode
orderForm.description
orderForm.quantity
orderForm.itemPrice
orderForm.price
orderForm.totalPrice
orderForm.deliveryDetails.billingAddress
orderForm.deliveryDetails.deliveryAddress
orderForm.noItems
CASE STUDIES


Heat recovery air conditioning cuts carbon emissions at London College


S


tudents and staff at Barnet and Southgate College are benefiting from an outstanding indoor environment following installation


of Toshiba’s award-winning heat recovery air conditioning system by Bry-Kol Building Services. Toshiba outdoor units on the roof. Barnet and Southgate College, a north London college with approximately 13,000 students across three campuses, recently completed a major upgrade of the main teaching block on its Southgate site. The project involved back-to- concrete refurbishment of facilities, including engineering, laboratory, administration and teaching spaces, and installation of new high- performance HVAC systems, headed by Bry- Kol Building Services as mechanical services contractor on the project. The high-efficiency Toshiba air conditioning solution chosen comprises Super Heat Recovery Multi (SHRM-e) Variable Refrigerant Flow (VRF) systems linked to Toshiba VN-M heat recovery ventilation units, along with SmartTouch controllers. Indoor units include mostly four-


way ceiling suspended cassettes, plus high wall units and concealed ducted systems. The heat recovery ventilation system harvests energy that would otherwise be lost from the building when it is exhausted, and uses it to warm incoming fresh air to reduce the need for heating, saving energy and reducing the building’s carbon emissions. The high performance Toshiba solution was selected by contractor Bry-Kol Building Services as it offered the outstanding energy efficiency, noise and comfort characteristics required for the project. “We know Toshiba equipment well and it is excellent, and backed by superb technical support,” said Bry-Kol project manager Jason Taylor, who led the installation. “They are very proactive and anything we need from them, we get when we need it. Toshiba produced all the schematics for the project, and inevitably there were some changes to the design along the way. However, Toshiba were able to quickly update the drawings and provide us with updates – often within a day.”


The installation on floors two to five of the building took place while the first floor remained occupied and operational, requiring careful planning and management on site. Toshiba’s SHRM-e three-pipe heat recovery VRF air conditioning system sets an industry benchmark for energy efficiency performance and continuous heating, achieving a world- first European Seasonal Energy Efficiency Ratio (ESEER) of 8 in most capacities. The system uses an advanced rotary compressor, developed and manufactured by Toshiba, based on a two-stage compression process for improved efficiency and performance. Wear surfaces on compression vanes are treated with a high-tech Diamond- Like Carbon (DLC) coating, giving outstanding hardness, wear resistance and reliability. This enables a significant increase in compressor rotation speed, resulting in a higher displacement volume – up to 50% greater than for the previous generation of VRF systems – delivering a higher duty from a smaller compressor, with less power.


www.acr-news.com


March 2021 41


Page 1  |  Page 2  |  Page 3  |  Page 4  |  Page 5  |  Page 6  |  Page 7  |  Page 8  |  Page 9  |  Page 10  |  Page 11  |  Page 12  |  Page 13  |  Page 14  |  Page 15  |  Page 16  |  Page 17  |  Page 18  |  Page 19  |  Page 20  |  Page 21  |  Page 22  |  Page 23  |  Page 24  |  Page 25  |  Page 26  |  Page 27  |  Page 28  |  Page 29  |  Page 30  |  Page 31  |  Page 32  |  Page 33  |  Page 34  |  Page 35  |  Page 36  |  Page 37  |  Page 38  |  Page 39  |  Page 40  |  Page 41  |  Page 42  |  Page 43  |  Page 44  |  Page 45  |  Page 46  |  Page 47  |  Page 48