CASE STUDIES
Roaring success for gym’s air con
L
eo Gym in Marlow is a state-of-the-art space for beginners and experienced athletes alike. The team needed an air conditioning and ventilation system that matched the environment they were creating, so they turned to 361 Degrees for help.
HVAC installation and temperature control in the gym not only boosts productivity and comfort, but is also imperative for maintaining the health and wellbeing of members. Viruses and bacteria can harbour in poorly ventilated environments as droplets in the air and in warm, damp environments such as gyms, this bacteria grows quickly. The atmosphere and environment of a commercial space can have a signifi cant impact on the customer experience, which will ultimately determine whether or not they wish to return. By implementing a tailored solution, the Leo Gym team wanted to ensure ongoing customer satisfaction and retention whilst generating new business via word of mouth. A good gym should motivate and inspire, providing an environment that rivals the open
48 April 2019
air. When designs fall short, stale air or the uncomfortable feeling of wind blowing around from a badly conceived air conditioning system can easily put customers off returning to the gym. Temperature control plays a big part in the overall user experience, with seasonality being key. In the summer, customers look for a cool and comfortable environment to work out in, whereas in the winter, they require a space warm enough to take away the chill, without being so warm that the space becomes uncomfortable. Finding the balance was a challenging task. Gym owner Maarten Donk said: “Our building is unfortunately not structured in a way that keeps heat or cool in very well. It’s a very old industrial building, so a good air conditioning system was very important.”
Bevan Green, technical sales consultant at 361 Degrees, said: “We went in there and understood Maarten’s needs; we could see what he was trying to create straight away. Getting fresh air into the space is absolutely key for having a good workout and feeling good afterwards.”
The Leo Gym team’s original proposal was for a VRF system, but after visiting the site and assessing the 2,200 sq ft gym area, 361 Degrees found that a split unit approach would be more eff ective. This allowed the long, thin building’s external walls to be used for pipe runs. An impressive domed roof allowed for the use of exposed ductwork, which matched to the aesthetic of the modern, vibrant space. The Leo team chose to work with 361 Degrees based on its reputation for working eff ectively with and around other tradespeople. Work was being undertaken elsewhere in the building in order to ensure a quick completion. In addition to the fi rst-fl oor gym, the ground fl oor was equipped with a reception area, changing rooms and a yoga studio. With each space having its own requirements, 361 Degrees’ proactive project managers scheduled work around electricians and other contractors to ensure a smooth installation across both fl oors. The result is a stunning environment that motivates and energises every customer.
www.acr-news.com
Page 1 |
Page 2 |
Page 3 |
Page 4 |
Page 5 |
Page 6 |
Page 7 |
Page 8 |
Page 9 |
Page 10 |
Page 11 |
Page 12 |
Page 13 |
Page 14 |
Page 15 |
Page 16 |
Page 17 |
Page 18 |
Page 19 |
Page 20 |
Page 21 |
Page 22 |
Page 23 |
Page 24 |
Page 25 |
Page 26 |
Page 27 |
Page 28 |
Page 29 |
Page 30 |
Page 31 |
Page 32 |
Page 33 |
Page 34 |
Page 35 |
Page 36 |
Page 37 |
Page 38 |
Page 39 |
Page 40 |
Page 41 |
Page 42 |
Page 43 |
Page 44 |
Page 45 |
Page 46 |
Page 47 |
Page 48 |
Page 49 |
Page 50 |
Page 51 |
Page 52 |
Page 53 |
Page 54 |
Page 55 |
Page 56