search.noResults

search.searching

dataCollection.invalidEmail
note.createNoteMessage

search.noResults

search.searching

orderForm.title

orderForm.productCode
orderForm.description
orderForm.quantity
orderForm.itemPrice
orderForm.price
orderForm.totalPrice
orderForm.deliveryDetails.billingAddress
orderForm.deliveryDetails.deliveryAddress
orderForm.noItems
AIR H


less than ethical approach often pays off – at policed across the building services sector, this lower price to the client. As standards are rarely the new standards in order to be able to quote a commercial building sector are simply ignoring i s growing evidence that some suppliers to the


least for the supplier. Legacy


However, the outcome is that building owners and occupiers are left with systems that are not fit


legacy of poor performance – and they pay more for purpose, are not legally compliant and leave a


airborne pollutants – but it does not need to be systems will also leave occupants vulnerable to As well as missing energy targets, these in the long-run too.


price What is required however is the rigorous without having to over-specify on size and meets the energy efficiency and IAQ criteria It is perfectly possible to design a system that t his way.


should establish efficiency based on 65% of system then the ErP states that an engineer F or example, if it is a variable air volume (VAV) including properly defining the type of system. a pplication of good, basic engineering principles, price. What is required, however, is the rigorous


design duty – rather than the all too common practice of simply basing all the calculations on 100% duty with 10% added ‘just in case’. That unfortunate habit has left a legacy of housands of over-sized systems that can never meet their energy efficiency targets because they are too big. They also fail more quickly because th


th


hey cost the client more than if a properly sized ystem had been specified in the first place. Daikin Applied looks to meet the client’s requirements by accurately sizing and using


technical innovations such as EC fans in order to minimise energy consumption.


ations such as EC fans in order to y consumption.


hey are continually cycling on and off rather than operating for longer periods at lower duty – and th sy


Fan power is also specifically referenced in the revised ErP legislation, and is another design aspect that should not be ignored by specifiers. It also calls for multiple fan systems to build in redundancy, as well as improving efficiency. The bonus for engineers is that EC fans are more compact than DC equivalents, which means they can help to reduce the size of the system and meet new energy targets, while at the same time making sure building occupants are protected from air pollution.


also specifically referenced in legislation, and is another design uld not be ignored by specifiers. multiple fan systems to build in well as improving efficiency. r engineers is that EC fans are than DC equivalents, which means o reduce the size of the system energy targets, while at the ing sure building occupants are air pollution.


HANDLING UNITS


Energy Ef fficient Upgrades Munter


Benefits include: dehumidifiers an air treatment, offer E s, global


nd air handling units (AHU’s). ffer EC plug fan upgr ades for leader s in energy efficient


R•educe ener rgy consumption by up to 75%


• Save on labour and maintenance cos • Reduce runn


Pre Upgrade example Post Upgrade example


15GWh of e where Munters A Proven global installations


01480 432243 info@munters.co.uk mun


s including Heathrow Airpor t, AHU upgrades sa ve


ters.com/ahufanupgrades energy per year!


• FREE, full sur • Improve spe • Reduce CO2 • No more bear • No more belts t


saves time, m • Upgrading i


earings to grease elts to change


rvey and dat a logging service ed control 2 emissions


nstead of r eplacing AHU’s money and r esources


our and maintenance costs ning costs


Page 1  |  Page 2  |  Page 3  |  Page 4  |  Page 5  |  Page 6  |  Page 7  |  Page 8  |  Page 9  |  Page 10  |  Page 11  |  Page 12  |  Page 13  |  Page 14  |  Page 15  |  Page 16  |  Page 17  |  Page 18  |  Page 19  |  Page 20  |  Page 21  |  Page 22  |  Page 23  |  Page 24  |  Page 25  |  Page 26  |  Page 27  |  Page 28  |  Page 29  |  Page 30  |  Page 31  |  Page 32  |  Page 33  |  Page 34  |  Page 35  |  Page 36  |  Page 37  |  Page 38  |  Page 39  |  Page 40  |  Page 41  |  Page 42  |  Page 43  |  Page 44  |  Page 45  |  Page 46  |  Page 47  |  Page 48  |  Page 49  |  Page 50  |  Page 51  |  Page 52  |  Page 53  |  Page 54  |  Page 55  |  Page 56