Test & measurement
DYNAMIC FACILITIES DEMAND DYNAMIC MEASUREMENTS
AI workloads are fundamentally different from traditional data centre workloads. AI training jobs are intensive and intermittent. A cluster transitions from idle to full training load in minutes, generating a step change in thermal output that the cooling system must respond to in real time. The CDU managing that cluster needs to control the cooling loop instantly and continuously, rather than with a delay of several minutes. It must ensure that supply and return temperatures are within limits, pressure and flow rates are as they should be, and the ambient dew point near the cold manifolds stays within tolerance as the system heats up.
Reliable measurements make dynamic control possible. Without accurate real-time data on critical parameters across the facility, the control systems are operating on delayed or inaccurate information. The consequences cascade: inefficient cooling wastes energy, inadequate cooling risks hardware, and overcorrection wastes both.
Every percentage point of efficiency improvement in a facility running hundreds of kilowatts per rack translates directly into operating cost and carbon impact. That connection between measurement quality and operational outcome is what makes getting the instrumentation right a business decision, not just a technical one.
WHAT THE NEXT GENERATION WILL REQUIRE
The direction from here is more of everything that is already challenging. Rack densities will continue to increase. Each step in this progression adds measurement requirements that do not yet have the benefit of decades of industry practice behind them.
Reliable measurements are the foundation on which everything else is built. They allow cooling systems to be controlled precisely rather than conservatively, and energy efficiency targets to be achieved rather than merely aspired to. They give operators confidence that both the cooling infrastructure and the computer hardware it serves are operating within safe parameters. And they provide the early warning that separates a recoverable problem from an expensive one.
Without trustworthy measurements, a liquid- cooled data centre is operating on assumptions. And at these rack densities, assumptions are expensive. The industry is still building its understanding of what rigorous measurement looks like in this environment. That understanding is where the hard work of the next phase begins.
Vaisala
www.vaisala.com Instrumentation Monthly October 2026 35
Page 1 |
Page 2 |
Page 3 |
Page 4 |
Page 5 |
Page 6 |
Page 7 |
Page 8 |
Page 9 |
Page 10 |
Page 11 |
Page 12 |
Page 13 |
Page 14 |
Page 15 |
Page 16 |
Page 17 |
Page 18 |
Page 19 |
Page 20 |
Page 21 |
Page 22 |
Page 23 |
Page 24 |
Page 25 |
Page 26 |
Page 27 |
Page 28 |
Page 29 |
Page 30 |
Page 31 |
Page 32 |
Page 33 |
Page 34 |
Page 35 |
Page 36 |
Page 37 |
Page 38 |
Page 39 |
Page 40 |
Page 41 |
Page 42 |
Page 43 |
Page 44 |
Page 45 |
Page 46 |
Page 47 |
Page 48 |
Page 49 |
Page 50 |
Page 51 |
Page 52 |
Page 53 |
Page 54 |
Page 55 |
Page 56 |
Page 57 |
Page 58 |
Page 59 |
Page 60 |
Page 61 |
Page 62 |
Page 63 |
Page 64 |
Page 65 |
Page 66 |
Page 67 |
Page 68 |
Page 69 |
Page 70 |
Page 71 |
Page 72