search.noResults

search.searching

saml.title
dataCollection.invalidEmail
note.createNoteMessage

search.noResults

search.searching

orderForm.title

orderForm.productCode
orderForm.description
orderForm.quantity
orderForm.itemPrice
orderForm.price
orderForm.totalPrice
orderForm.deliveryDetails.billingAddress
orderForm.deliveryDetails.deliveryAddress
orderForm.noItems
Lighting Solutions


TRILUX Lights Spain’s Most Sustainable Office Building Colón Towers In Madrid Sets New Standards With NZEB, WELL And LEED Certifications


TRILUX has completed a landmark lighting project at Colón Towers (Torres Colón) in Madrid – now recognised as Spain’s most sustainable office building. Owned by insurance group Mutua Madrileña,


the 31-storey


building is the first in the country to achieve certification as a Nearly Zero Energy Building (NZEB) and will also receive WELL and LEED certifications in recognition of its outstanding


environmental workplace credentials.


An integral part of meeting these ambitious standards was the smart, energy-efficient lighting solution designed and delivered by TRILUX Spain. Around 3,000 luminaires were installed


throughout the building,


offering not only optimal light quality and visual comfort, but also integrated intelligence and digital control.


High-Performance Lighting For Modern Workspaces


TRILUX developed bespoke linear luminaires specifically for this project, all equipped with integrated presence and daylight sensors. The luminaires adjust automatically to the time of day and occupancy, supporting both energy efficiency and user wellbeing.


38 fmuk and


Lighting colour temperature (4,200 Kelvin), high colour rendering (CRI 90), and a unified glare rating of 19 ensure compliance with WELL certification criteria, helping to promote productivity and comfort. For added design value,


Sonnos


pendant luminaires in black were also selected to enhance aesthetics in key areas.


Smart, Connected And Future-Proof


Lighting throughout the building is controlled using the Casambi system, with each floor connected to a central gateway. This enables the building team to manage lighting remotely, monitor performance in real time, and streamline maintenance. If a luminaire needs replacing, reprogramming is not required – delivering both time and cost savings.


This project underlines TRILUX’s


capability in delivering cutting-edge lighting solutions that meet the highest sustainability and workplace standards, supporting building owners and occupiers alike.


For further information, visit: www.trilux.com/en


Page 1  |  Page 2  |  Page 3  |  Page 4  |  Page 5  |  Page 6  |  Page 7  |  Page 8  |  Page 9  |  Page 10  |  Page 11  |  Page 12  |  Page 13  |  Page 14  |  Page 15  |  Page 16  |  Page 17  |  Page 18  |  Page 19  |  Page 20  |  Page 21  |  Page 22  |  Page 23  |  Page 24  |  Page 25  |  Page 26  |  Page 27  |  Page 28  |  Page 29  |  Page 30  |  Page 31  |  Page 32  |  Page 33  |  Page 34  |  Page 35  |  Page 36  |  Page 37  |  Page 38  |  Page 39  |  Page 40  |  Page 41  |  Page 42  |  Page 43  |  Page 44