search.noResults

search.searching

saml.title
dataCollection.invalidEmail
note.createNoteMessage

search.noResults

search.searching

orderForm.title

orderForm.productCode
orderForm.description
orderForm.quantity
orderForm.itemPrice
orderForm.price
orderForm.totalPrice
orderForm.deliveryDetails.billingAddress
orderForm.deliveryDetails.deliveryAddress
orderForm.noItems
BEFORE LOADING


Prior to delivery to the shipper for stuffing, all refrigerated containers should be subject to a Pre-Trip Inspection (PTI) on behalf of the carrier, conducted by a suitably qualified person. The PTI will include a visual inspection of the container’s structure and refrigeration machinery and a function test of the plant.


In case of a failed test, the necessary repairs should be carried out before re-testing. Where stuffing is delayed or the shipment cancelled, it is recommended that the carrier’s procedures stipulate the maximum validity of a PTI prior to stuffing, after which a new PTI will be necessary.


The required set-point temperature and any humidity range and/or air exchange requirements are usually stipulated on the Bill of Lading/Sea Waybill, with often only a required set-point temperature detailed. All required carriage conditions should be set prior to container stuffing and the container cooled to the set-point before being filled.


ON BOARD THE VESSEL


Refrigerated containers should be stowed allowing safe access for periodic checking and for repairs. Britannia recommends that they are stowed no higher than the second tier from the deck or lashing bridge, and when on the second tier, a properly secured and rigged working platform should be fitted along with a safe means of access.


Access for checking and conducting repairs on refrigerated containers on the second tier should be subject to a risk assessment.


We are aware of refrigerated containers being stowed three or four tiers from the deck or lashing bridge, where checking during the voyage and the provision of repairs would be unsafe, if not impossible in the case of major repairs being necessary, such as changing a compressor says Britannia Club.


Upon loading, the vessel should ensure that all refrigerated containers designated as containing cargo that is temperature controlled, should be plugged in, the plug locking collar engaged on the socket, power switched on, and the socket box access securely closed to prevent spray and water ingress.


The refrigerated container function and temperature should also be checked every six hours and records of time and date, and delivery and return air temperatures kept.


INTERNET of THINGS (IoT) TECHNOLOGY


Internet of Things (IoT) refers to a network of interconnected devices and objects connected to the Internet, and it has also been introduced to the world of refrigerated containers.


In fact, some refrigerated container operators today offer IoT as part of their service, which allows the shipper to remotely pinpoint the container’s real-time location as well as monitor and maybe even adjust some of the container’s settings.


While this is all very convenient for the shipper, it does provide some concerns to the carrier, who is ultimately responsible for monitoring the container’s performance during its voyage, particularly as the container settings can now be altered remotely and without their knowledge according to Britannia.


For this reason, the carrier needs to ensure that for containers installed with IoT technology, the contract of carriage clearly states that: - The setting instructions, which may be stipulated on the bill of lading or on the reefer manifests/instructions provided to the ship for each container, remains the legally binding instructions in terms of the container’s settings, and which the ship shall monitor during the voyage. - Changes to these instructions should be communicated in writing, so that there is a clear paper trail of the instructions provided by the shipper to the ship. - The carrier cannot be held liable for any remote changes to the settings which has not been notified to the ship as agreed by the contract. - The carrier shall not be held liable for any malfunctioning of the IoT module.


In addition, the carrier should continue to monitor the containers installed with IoT technology in the same manner as with conventional refrigerated containers to ensure that: - At loading the refrigerated container is in a good working condition and that the settings are as prescribed by the bill of lading or reefer manifest/ instructions.


- During the voyage the container continues to work satisfactorily and maintains its set values.


Any indication of error, sign of faults or changes to the container’s settings should immediately be reported to the shipper for its clarification and further instructions.


Finally, the ship should be able to document that they have monitored the refrigerated container during the voyage as required and, if there is any sign or suspicion of the container malfunctioning, preserve evidence in order to reject a potential claim.


The Report • June 2022 • Issue 100 | 101


Page 1  |  Page 2  |  Page 3  |  Page 4  |  Page 5  |  Page 6  |  Page 7  |  Page 8  |  Page 9  |  Page 10  |  Page 11  |  Page 12  |  Page 13  |  Page 14  |  Page 15  |  Page 16  |  Page 17  |  Page 18  |  Page 19  |  Page 20  |  Page 21  |  Page 22  |  Page 23  |  Page 24  |  Page 25  |  Page 26  |  Page 27  |  Page 28  |  Page 29  |  Page 30  |  Page 31  |  Page 32  |  Page 33  |  Page 34  |  Page 35  |  Page 36  |  Page 37  |  Page 38  |  Page 39  |  Page 40  |  Page 41  |  Page 42  |  Page 43  |  Page 44  |  Page 45  |  Page 46  |  Page 47  |  Page 48  |  Page 49  |  Page 50  |  Page 51  |  Page 52  |  Page 53  |  Page 54  |  Page 55  |  Page 56  |  Page 57  |  Page 58  |  Page 59  |  Page 60  |  Page 61  |  Page 62  |  Page 63  |  Page 64  |  Page 65  |  Page 66  |  Page 67  |  Page 68  |  Page 69  |  Page 70  |  Page 71  |  Page 72  |  Page 73  |  Page 74  |  Page 75  |  Page 76  |  Page 77  |  Page 78  |  Page 79  |  Page 80  |  Page 81  |  Page 82  |  Page 83  |  Page 84  |  Page 85  |  Page 86  |  Page 87  |  Page 88  |  Page 89  |  Page 90  |  Page 91  |  Page 92  |  Page 93  |  Page 94  |  Page 95  |  Page 96  |  Page 97  |  Page 98  |  Page 99  |  Page 100  |  Page 101  |  Page 102  |  Page 103  |  Page 104  |  Page 105  |  Page 106  |  Page 107  |  Page 108  |  Page 109  |  Page 110  |  Page 111  |  Page 112  |  Page 113  |  Page 114  |  Page 115  |  Page 116  |  Page 117  |  Page 118  |  Page 119  |  Page 120  |  Page 121  |  Page 122  |  Page 123  |  Page 124  |  Page 125  |  Page 126  |  Page 127  |  Page 128  |  Page 129  |  Page 130  |  Page 131  |  Page 132  |  Page 133  |  Page 134  |  Page 135  |  Page 136