search.noResults

search.searching

dataCollection.invalidEmail
note.createNoteMessage

search.noResults

search.searching

orderForm.title

orderForm.productCode
orderForm.description
orderForm.quantity
orderForm.itemPrice
orderForm.price
orderForm.totalPrice
orderForm.deliveryDetails.billingAddress
orderForm.deliveryDetails.deliveryAddress
orderForm.noItems
HANGAR TALK Industry news relevant to your business


“This contract award is a testament to the government’s confidence in the CH-53K platform. This award shows that we are working hard to make the aircraft more affordable,” said Major General Greg Masiello, program executive office, air ASW, assault and special mission programs. “The capability and affordability of the CH-53K is important to ensure that we provide a valuable addition to the United States Marine Corps and our friends and allies.”


King Stallion Production Marches Ahead


U.S. Navy Awards Sikorsky Contract To Build Six More CH- 53K Heavy-Lift Helicopters


Sikorsky recently announced it will build six additional production CH-53K King Stallion helicopters under a new contract for the U.S. Navy. The aircraft will further support the U.S. Marine Corps in its mission to conduct expeditionary heavy-lift assault transport of armored vehicles, equipment and personnel to support distributed operations deep inland from a sea-based center of operations.


The six helicopters are part of a 200-aircraft Program of Record for the U.S. Marine Corps, and their addition makes a total of 24 CH-53K production aircraft now under contract. Under the terms of this most recent contract – known as Low Rate Initial Production (LRIP) Lot 4 – Sikorsky will begin deliveries of the six aircraft in January 2024.


The CH-53K program has five aircraft on the line at Sikorsky facilities in Connecticut and over two dozen in various stages of production. The program will deliver the first low-rate initial production aircraft in September 2021.


Sikorsky and its suppliers have made significant investments in facilities, machinery, tooling, and workforce training to ramp up production required for the CH-53K program. For example, for the first time, newly installed 10-ton cranes lifted a 12,000-pound gearbox into a CH-53K production aircraft.


“The production of this CH-53K helicopter represents a new era in capabilities, technologies, safety and mission flexibility for the U.S. Marine Corps. Sikorsky is committed to supporting the Marine Corps to maximize the benefits of this all-new helicopter,” said Bill Falk, Sikorsky CH-53K program director.


“Pilots are already training on state-of-the-art flight training devices to prepare in a safe, cost-effective manner for operational deployment,” Falk said.


Entrol Launches H05 FNPT II Simulator Based on H125 and AS350


Entrol recently added a new simulator to its wide portfolio of helicopter simulators: the entrol H05/H125 FNPT II.


The H05 FNPT II simulator is based on the H125, also known as the AS350, one of the best-selling helicopters around the world.


The standard configuration features dual G500H, GTN 650, a 180° x 40° cylindrical visual system, and a worldwide database. It can be certified as EASA FNPT II or FAA FTD Level 5.


“This new H05 FNPT II simulator is a great tool for flight schools and H125 operators to improve their pilot training and optimize their operative costs,” says Nacho Navacerrada, business development manager of Entrol.


32


Nov/Dec 2020


Page 1  |  Page 2  |  Page 3  |  Page 4  |  Page 5  |  Page 6  |  Page 7  |  Page 8  |  Page 9  |  Page 10  |  Page 11  |  Page 12  |  Page 13  |  Page 14  |  Page 15  |  Page 16  |  Page 17  |  Page 18  |  Page 19  |  Page 20  |  Page 21  |  Page 22  |  Page 23  |  Page 24  |  Page 25  |  Page 26  |  Page 27  |  Page 28  |  Page 29  |  Page 30  |  Page 31  |  Page 32  |  Page 33  |  Page 34  |  Page 35  |  Page 36  |  Page 37  |  Page 38  |  Page 39  |  Page 40  |  Page 41  |  Page 42  |  Page 43  |  Page 44  |  Page 45  |  Page 46  |  Page 47  |  Page 48  |  Page 49  |  Page 50  |  Page 51  |  Page 52  |  Page 53  |  Page 54  |  Page 55  |  Page 56  |  Page 57  |  Page 58  |  Page 59  |  Page 60  |  Page 61  |  Page 62  |  Page 63  |  Page 64  |  Page 65  |  Page 66  |  Page 67  |  Page 68  |  Page 69  |  Page 70  |  Page 71  |  Page 72  |  Page 73  |  Page 74  |  Page 75  |  Page 76  |  Page 77  |  Page 78  |  Page 79  |  Page 80  |  Page 81  |  Page 82  |  Page 83  |  Page 84  |  Page 85  |  Page 86  |  Page 87