search.noResults

search.searching

saml.title
dataCollection.invalidEmail
note.createNoteMessage

search.noResults

search.searching

orderForm.title

orderForm.productCode
orderForm.description
orderForm.quantity
orderForm.itemPrice
orderForm.price
orderForm.totalPrice
orderForm.deliveryDetails.billingAddress
orderForm.deliveryDetails.deliveryAddress
orderForm.noItems
New VX4 Prototype Completes First Tethered Piloted Flight


Vertical Aerospace (Vertical) recently had its latest VX4 prototype perform its first tethered piloted flight as it begins the “wheels up” phase of testing.


This VX4 performed a piloted flight while loosely tethered to the ground, during which Vertical measured over 20,000 flight and system parameters to verify thrust, handling qualities and system performance.


The tethered piloted flight took place after the U.K. Civil Aviation Authority (CAA) had issued Vertical with a Permit to Fly for its VX4 prototype, having rigorously evaluated the engineering, design, test data and aircraft, effectively conducting a “mini certification” program of the aircraft.


Vertical must submit documentation to the CAA to move through each flight phase, including extensive, detailed documentation covering every aspect from safety protocols and engineering specifications to operational procedures.


Following initial tethered flights, and once it has received permission from the CAA to expand the flight envelope, the VX4 will enter the next phase of testing, which will start with further


thrustborne flight testing. This will see the VX4 takeoff and land vertically and conduct low-speed flight manuvers with lift generated by the propellers.


Wingborne or conventional flight (CTOL) and the final critical test stage of piloted transition flight will follow, only when the CAA’s rigorous approval for this final phase of testing has been granted.


In advance of its first tethered flight, the VX4 successfully completed extensive ground testing, including powered propulsion testing of its advanced powertrain, which features proprietary battery packs capable of delivering 1.4 MW of peak power that have been designed and built at the state-of-the-art Vertical Energy Centre.


Stuart Simpson, CEO of Vertical Aerospace, said, “The first tethered flight of our new VX4 prototype is the result of 14 months of hard work taking this advanced aircraft all the way from design, through to development and now into the air.


“This moment is testament to the skill and commitment of hundreds of talented colleagues in our business who have made our VX4 aircraft the best eVTOL out there. Everyone at Vertical Aerospace remains laser focused on achieving piloted transition as we continue to progress towards our ultimate goal of commercialization and creating a new legacy for aviation.”


rotorpro.com 41


Page 1  |  Page 2  |  Page 3  |  Page 4  |  Page 5  |  Page 6  |  Page 7  |  Page 8  |  Page 9  |  Page 10  |  Page 11  |  Page 12  |  Page 13  |  Page 14  |  Page 15  |  Page 16  |  Page 17  |  Page 18  |  Page 19  |  Page 20  |  Page 21  |  Page 22  |  Page 23  |  Page 24  |  Page 25  |  Page 26  |  Page 27  |  Page 28  |  Page 29  |  Page 30  |  Page 31  |  Page 32  |  Page 33  |  Page 34  |  Page 35  |  Page 36  |  Page 37  |  Page 38  |  Page 39  |  Page 40  |  Page 41  |  Page 42  |  Page 43  |  Page 44  |  Page 45  |  Page 46  |  Page 47  |  Page 48  |  Page 49  |  Page 50  |  Page 51  |  Page 52  |  Page 53  |  Page 54  |  Page 55  |  Page 56  |  Page 57  |  Page 58  |  Page 59  |  Page 60  |  Page 61  |  Page 62  |  Page 63  |  Page 64  |  Page 65  |  Page 66  |  Page 67  |  Page 68  |  Page 69  |  Page 70  |  Page 71  |  Page 72  |  Page 73  |  Page 74  |  Page 75  |  Page 76  |  Page 77  |  Page 78  |  Page 79  |  Page 80  |  Page 81  |  Page 82  |  Page 83  |  Page 84