“The pre-installed sanitaryware provided a better quality finish and a programme advantage”.
Kevin Millen, Commercial Manager, Vinci Construction
Vepps Healthcare Queen Elizabeth Hospital
All sanitaryware was pre-plumbed and tested at our manufacturing facility, saving time and reducing labour required on site. By choosing Vepps, the installation could be achieved up to 75% fasterw than other traditional methods.