Improved design methods for wave impacts on offshore wind turbines
This year MARIN closed the very successful Wave impact on Fixed foundations WiFi I and II JIP. During the JIPs, more than 250,000 wave events were simulated and full-scale measurements were carried out for a Vestas V90 turbine located at Belwind wind farm off the coast of Belgium.
Erik-Jan de Ridder
e.d.ridder@marin.nl
12 report
underway in 2012. The WiFi JIP consisted of a very strong consortium comprising 20 participants, including research institutes,
T
he project was initiated by MARIN, ECN, Ramboll, DNVGL, Deltares and Statkraft and got
classification societies, contractors, engineering and utility companies. By involving 20 different participants a considerable amount of knowledge in the field of wave loading was available for and distributed in the consortium, and this
Page 1 |
Page 2 |
Page 3 |
Page 4 |
Page 5 |
Page 6 |
Page 7 |
Page 8 |
Page 9 |
Page 10 |
Page 11 |
Page 12 |
Page 13 |
Page 14 |
Page 15 |
Page 16 |
Page 17 |
Page 18 |
Page 19 |
Page 20 |
Page 21 |
Page 22 |
Page 23 |
Page 24 |
Page 25 |
Page 26 |
Page 27 |
Page 28