RAISED ISSUES


Carpet tiles over raised access flooring is a common combination in commercial environments but this type of project requires contractors to undertake particular subfloor preparation procedures to ensure the long-term performance of the installation. F. Ball advises.


Consisting of horizontal panels, typically made of metal or cementitious material, supported by adjustable ‘legs’, raised access flooring provides an elevated structural floor above a solid substrate, such as concrete, allowing space beneath for electrical wiring and other services found in modern commercial environments. Carpet tiles are similarly practical in office environments; when installed using a carpet tile tackifier, individual tiles can be easily lifted and replaced when they become stained or worn – in walkways or areas occupied by chairs with castor wheels, for example.


Installing floorcoverings over raised access panels presents a few specific considerations, including the need to fill joints between panels before installing floorcoverings, remembering to prime the subfloor beforehand, and to select a levelling compound that can accommodate movement in the substrate. Before beginning, contractors should also check the height of the elevated floor is consistent, ensuring no safety hazards and a level base for the application of subfloor preparation products.


FILLING THE GAPS When installed, raised access panels have small joints between them. If a levelling compound is applied directly over the top of raised access panels, these gaps may result in weak points, which can cause the levelling compound to crack and lose its integrity. Therefore, the gaps must be filled before a levelling compound is applied and floorcoverings are installed to ensure the performance of the installation throughout its lifetime.


Priming is also important when working over raised access panels. When used over non-absorbent subfloors, such as metal panels, priming serves to promote the application characteristics of subsequently applied levelling compounds. When used over absorbent subfloors, such as panels made of cementitious materials, priming also serves to promote adhesion, as well as preventing levelling compounds from drying too rapidly, resulting in a reduced working time. It also helps to prevent pin-holing, caused by tiny bubbles resulting from the slow escape of air from the subfloor, which burst on reaching the surface, leaving small pinholes or craters as the levelling compound dries.


TWO IN ONE Recently-developed cement-based primers, such as F. Ball’s Stopgap Fill and Prime, are available that are designed specifically for use over raised access panels, which fill the gaps at the joints between the panels whilst priming the subfloor, saving valuable time. These cement-based primers have a thixotropic consistency, meaning that they flow freely when stirred but set to a gel-like consistency on standing. This enables the joints to be filled to minimise movement of the substrate. These primers are also suitable for use over raised access


26 | OFFICE & WORKPLACE


panels and substrates with well-bonded, waterproof adhesive residues prior to the application of a levelling compound.


Once the primer has cured, a fibre-filled levelling compound, such as F. Ball’s Stopgap 700 Superflex, should then be applied to create a smooth base for the receipt of new floorcoverings. The product is reinforced with tiny fibres that maintain the integrity of the levelling compound, preventing cracks from forming as a result of minor subfloor movement caused by foot traffic or temperature fluctuations. It is suitable for application over plywood and steel subfloors, including raised access panels, as well as concrete and sand/ cement screeds.


CARPET TILE TACKIFIERS When the applied levelling compound has cured, contractors can proceed to installing carpet tiles – Stopgap 700 Superflex will be ready to receive floorcoverings in as little as three hours when applied at a thickness of 3mm.


Installing carpet tiles using a carpet tile tackifier, such as F. Ball’s Styccobond F41, ensures that carpet tiles are held firmly in place when subject to lateral movements, such as everyday foot traffic and equipment being wheeled around, while allowing them to be easily lifted vertically if they need to be replaced at a later date. The adhesive is solvent free and, as testament to its ultra-low VOC emissions, certified EMICODE EC1 Plus.


To use a carpet tile tackifier, contractors simply apply the adhesive evenly across the entire subfloor, using a roller or a brush, and allow it to dry to a clear, tacky film. The adhesive will then remain permanently tacky, enabling individual tiles to be removed.


www.f-ball.com


Page 1  |  Page 2  |  Page 3  |  Page 4  |  Page 5  |  Page 6  |  Page 7  |  Page 8  |  Page 9  |  Page 10  |  Page 11  |  Page 12  |  Page 13  |  Page 14  |  Page 15  |  Page 16  |  Page 17  |  Page 18  |  Page 19  |  Page 20  |  Page 21  |  Page 22  |  Page 23  |  Page 24  |  Page 25  |  Page 26  |  Page 27  |  Page 28  |  Page 29  |  Page 30  |  Page 31  |  Page 32  |  Page 33  |  Page 34  |  Page 35  |  Page 36  |  Page 37  |  Page 38  |  Page 39  |  Page 40  |  Page 41  |  Page 42  |  Page 43  |  Page 44  |  Page 45  |  Page 46  |  Page 47  |  Page 48  |  Page 49  |  Page 50