joint interfaces. The material was trowelled into the joints to create a level, stable base that would flex with the substrate rather than crack or delaminate.
For the ground floor, where moisture readings exceeded acceptable levels, Bostik specified HYTEC P510 RENORAPID – a fast-drying, single-component damp proof membrane. This two-coat system provides protection against moisture levels up to 95% RH and dries in just one to two hours per coat, allowing the installation to proceed without lengthy delays. The rapid cure time was particularly valuable on a fast-track modular project where programme adherence was critical.
Once the DPM had fully cured, the entire substrate was primed with Bostik GRIP A526 UNIVERSAL, a water-based acrylic dispersion primer. This multipurpose product improved the bond of subsequent layers and extended the working time of the smoothing compound for an optimal finish.
The smoothing phase relied on Bostik SL C530 FLEX, a fibre- reinforced, flexible smoothing compound with a compressive strength of 30N/mm². Its flexibility made it particularly suited to substrates subject to minimal vibration or movement, whilst its rapid-setting characteristics aligned with the project’s tight schedule. Applied at a thickness of 3mm, it provided a smooth, level surface ready to receive the final floorcovering.
“Bostik’s technical support throughout the installation was invaluable,” added Emma Wilson. “They didn’t just recommend products – they visited the site to support the installation team, which made a real difference to the quality and efficiency of the work.”
The final floor finish comprised sheet PVC, in the form of Altro Walkway 20 safety flooring, bonded using Bostik STIX A800 PREMIUM – an ultra-high-performance adhesive designed for resilient floorcoverings. With its strong initial grab, extended open time, and very low VOC emissions, STIX A800 PREMIUM
delivered a reliable, long-lasting bond suitable for the high- traffic demands of a school environment.
ON SCHEDULE
The flooring installation at Saint Benedict Catholic Voluntary Academy was completed on schedule, with the Bostik system
˝Everything went smoothly, and
the client was delighted with the finished result – fit for purpose, on time and problem-free.˝
solution successfully addressing both the moisture and bay joint challenges inherent in the modular construction. The combination of rapid-curing products and expert technical support ensured minimal disruption to the overall project timeline and aligned with Algeco’s overarching modular construction programme.
“The team were really happy with how the products performed,” Emma Wilson confirmed. “Everything went smoothly, and the client was delighted with the finished result. It’s exactly the kind of installation you want – fit for purpose, on time, and problem-free.”
The project demonstrates the importance of selecting the right system for the specific demands of modular construction. By combining comprehensive site assessment with targeted product solutions, Bostik ensured a durable, high-performance flooring installation that will withstand the rigours of daily school life for years to come.
www.bostik-profloor.co.uk
x.com/TContractFloors
41
Page 1 |
Page 2 |
Page 3 |
Page 4 |
Page 5 |
Page 6 |
Page 7 |
Page 8 |
Page 9 |
Page 10 |
Page 11 |
Page 12 |
Page 13 |
Page 14 |
Page 15 |
Page 16 |
Page 17 |
Page 18 |
Page 19 |
Page 20 |
Page 21 |
Page 22 |
Page 23 |
Page 24 |
Page 25 |
Page 26 |
Page 27 |
Page 28 |
Page 29 |
Page 30 |
Page 31 |
Page 32 |
Page 33 |
Page 34 |
Page 35 |
Page 36 |
Page 37 |
Page 38 |
Page 39 |
Page 40 |
Page 41 |
Page 42 |
Page 43 |
Page 44 |
Page 45 |
Page 46 |
Page 47 |
Page 48