COMMERCIAL REFURBISHMENT CASE STUDY
TICKING ALL THE BOXES
Heatstar play vital hotel role… L
ocated in the historical region of Maramures, Northern Romania, the Mirage Resort Hotel is surround by beautiful mountains
and outside views, and thanks to the introduction of a new spa and leisure facilities those beautiful views can now be found on the inside too. The new Lotus SPA came up as a
natural development of Mirage Resort services, sustained by their mission to keep their customers entertained no matter the season they decide to visit. By supplying the environmental
control to these two new pools Heatstar were able to show off their talents when it comes to providing a bespoke solution due to constraints placed upon the project, with full and professional support by Premium Exclusiv Group who support Heatstar’s export business in Romania. The semi-basement of the hotel
became the location where this project was brought to life and adapting the proper airduct size for a plant room which did not have the required height and the necessary technical areas, turned out to be an initial challenge of this project.
WEATHERPROOF
Drawing upon 40 years of experience and expertise Heatstar were able to offer a solution that ticked all the boxes placed on the project by the owners yet still offering the very best in energy efficiency with long-term low running costs. The Heatstar Taurus unit was weatherproofed using a special protective insulated casing and placed externally of the plant room. This special casing will ensure the Taurus is able to cope with different climatic conditions which usually reach -20°C during the winter season.
Due to the unit being placed
externally a requirement was given for the Heatstar unit to be controlled within the Lotus Spa’s reception area so that all control and monitoring functions could be accessed by staff with ease. The Lynx control package installed to enhance the system’s performance and usability and to create the perfect solution.
“DRAWING UPON 40 YEARS OF EXPERIENCE AND EXPERTISE HEATSTAR WERE ABLE TO OFFER A SOLUTION THAT TICKED ALL THE BOXES PLACED ON THE PROJECT”
Turning the spotlight on to the pools
themselves, the site is made up of both the large indoor swimming pool sized at 15m by 5m and heated to 28°C, and a vitality pool at 5m x 4m and heated to 36°C giving bathers a luxurious and massaging experience.
ULTRA EFFICIENT
At the heart of every successful pool is a highly effective environmental control unit. The unit chosen for the Lotus Spa project was the Heatstar Taurus HPXF 180 Super – an optimum efficiency environmental control system. Designed specifically for application on large water leisure centres and municipal swimming pools the Taurus offers humidity control, energy recovery, fresh air, variable rate ventilation, mechanical cooling and renewable energy heating solutions. The Taurus utilises the latest “Blue- EC” ultra-efficient, intelligent digital inverter fan technology and is fully compliant with the latest building control regulations for non-residential applications
32 WINTER 2021
Page 1 |
Page 2 |
Page 3 |
Page 4 |
Page 5 |
Page 6 |
Page 7 |
Page 8 |
Page 9 |
Page 10 |
Page 11 |
Page 12 |
Page 13 |
Page 14 |
Page 15 |
Page 16 |
Page 17 |
Page 18 |
Page 19 |
Page 20 |
Page 21 |
Page 22 |
Page 23 |
Page 24 |
Page 25 |
Page 26 |
Page 27 |
Page 28 |
Page 29 |
Page 30 |
Page 31 |
Page 32 |
Page 33 |
Page 34 |
Page 35 |
Page 36 |
Page 37 |
Page 38 |
Page 39 |
Page 40 |
Page 41 |
Page 42 |
Page 43 |
Page 44 |
Page 45 |
Page 46 |
Page 47 |
Page 48 |
Page 49 |
Page 50 |
Page 51 |
Page 52 |
Page 53 |
Page 54 |
Page 55 |
Page 56 |
Page 57 |
Page 58 |
Page 59 |
Page 60 |
Page 61 |
Page 62 |
Page 63 |
Page 64 |
Page 65 |
Page 66 |
Page 67 |
Page 68 |
Page 69 |
Page 70 |
Page 71 |
Page 72 |
Page 73 |
Page 74 |
Page 75 |
Page 76 |
Page 77 |
Page 78 |
Page 79 |
Page 80 |
Page 81 |
Page 82 |
Page 83 |
Page 84