search.noResults

search.searching

dataCollection.invalidEmail
note.createNoteMessage

search.noResults

search.searching

orderForm.title

orderForm.productCode
orderForm.description
orderForm.quantity
orderForm.itemPrice
orderForm.price
orderForm.totalPrice
orderForm.deliveryDetails.billingAddress
orderForm.deliveryDetails.deliveryAddress
orderForm.noItems
68 INTERIORS


Raising the standard


BAL, a market leader for full tiling solutions, are revolutionising the standard-set category with new adhesive technology; BAL Flex One. BAL Flex One give fixers longer working and open times – but still has a faster setting time prior to grouting. Outperforming other products with an excellent 2.5 hour working time and a 45-minute open time at 20°C – this allows more working time to fix in warmer conditions (and less wastage in buckets), more time to adjust larger tiles, and more time when working on particularly complex installations. With a 6-hour set time, the new adhesive allows fixers to grout in the evening or early the next day – significantly cutting down installation time compared to traditional standard setting products that require up to 24 hours to set! BAL’s new standard set technology also provides outstanding usability – helping to overcome the many obstacles that face fixers on a modern project. With one of the thickest bed depths on the market for standard sets up to 15mm and, the formulation helps fixers to overcome some background irregularities where isolated building out may be required.


01782 591100 www.bal-adhesives.com Cistermiser valves help to conserve water at Cambridge Assessment’s new HQ


The washrooms in the prestigious new international headquarters of exams group Cambridge Assessment feature the latest infrared water management technology from Cistermiser. More than 1,600 Cambridge-based employees, formerly based in 11 Cambridge Assessment offices located across the city, have been brought together in the new HQ complex called The Triangle. The series of linked buildings, sited to the south east of the city centre, have been designed to provide enough office space to eventually accommodate up to 3,000 people by 2025. 96 Cistermiser Direct Flush ‘Discreet’ infrared urinal flush control valves (DFDs) have been installed in The Triangle’s 20 washrooms by M & E sub-contractor Allied Mechanical Services. The Direct Flush automatically flushes the individual urinal after use, using as little as 0.5 litres of water each time. This ensures high levels of hygiene from the minimum volume of water. Tony Buckley, Project Manager for Allied Mechanical Services, said: “From an installation point of view, the Cistermiser DFDs and associated multi-product power supply units are quick and easy to fit.


0118 969 1611 www.cistermiser.co.uk


WWW.ARCHITECTSDATAFILE.CO.UK


ADF JUNE 2019


Page 1  |  Page 2  |  Page 3  |  Page 4  |  Page 5  |  Page 6  |  Page 7  |  Page 8  |  Page 9  |  Page 10  |  Page 11  |  Page 12  |  Page 13  |  Page 14  |  Page 15  |  Page 16  |  Page 17  |  Page 18  |  Page 19  |  Page 20  |  Page 21  |  Page 22  |  Page 23  |  Page 24  |  Page 25  |  Page 26  |  Page 27  |  Page 28  |  Page 29  |  Page 30  |  Page 31  |  Page 32  |  Page 33  |  Page 34  |  Page 35  |  Page 36  |  Page 37  |  Page 38  |  Page 39  |  Page 40  |  Page 41  |  Page 42  |  Page 43  |  Page 44  |  Page 45  |  Page 46  |  Page 47  |  Page 48  |  Page 49  |  Page 50  |  Page 51  |  Page 52  |  Page 53  |  Page 54  |  Page 55  |  Page 56  |  Page 57  |  Page 58  |  Page 59  |  Page 60  |  Page 61  |  Page 62  |  Page 63  |  Page 64  |  Page 65  |  Page 66  |  Page 67  |  Page 68  |  Page 69  |  Page 70  |  Page 71  |  Page 72  |  Page 73  |  Page 74  |  Page 75  |  Page 76  |  Page 77  |  Page 78  |  Page 79  |  Page 80  |  Page 81  |  Page 82  |  Page 83  |  Page 84  |  Page 85  |  Page 86  |  Page 87  |  Page 88  |  Page 89  |  Page 90  |  Page 91  |  Page 92