search.noResults

search.searching

dataCollection.invalidEmail
note.createNoteMessage

search.noResults

search.searching

orderForm.title

orderForm.productCode
orderForm.description
orderForm.quantity
orderForm.itemPrice
orderForm.price
orderForm.totalPrice
orderForm.deliveryDetails.billingAddress
orderForm.deliveryDetails.deliveryAddress
orderForm.noItems
INSULATION; INTERIORS


61


Passivhaus estate constructed with Kingspan


The Kingspan TEK Building System is providing a precise offsite building solution for one of the country’s largest Passivhaus developments in Bowthorpe, Norwich. After reviewing the market offering to achieve the demanding fabric


requirements, it was concluded that the Kingspan TEK Building System was the best solution for the project on the basis of technical specification and value offered. Kingspan TEK Building System panels can achieve U-values of 0.20 – 0.17 W/m2


01544 387 384 www.kingspantek.co.uk Specification for Marmox Multiboard


A new residential development by Barratt London is including the use of Marmox Multiboard for its outstanding physical performance with two walls around the 20 metre swimming pool being lined with the moisture resistant backing board. Landmark Place is offering purchasers of the 165


luxury apartments and penthouses, stunning views of the Thames, Tower Bridge and the Southbank. The ground floor pool and spa is being fitted out by a specialist sub-contractor consuming close to 100 of the 2500 x 600mm Multiboards for the work, as well as six boxes of dowels to secure them and 30 rolls of Marmox Jointing Tape.


01634 835290 www.marmox.co.uk .K, or better ‘out of the box’.


With an additional layer of insulation, the site team were able to further improve the thermal performance of the external walls.


Kingspan helps transport station into future


The Kingspan OPTIM-R Flooring System has been installed as part of the £1bn refurbishment of London Bridge Station. The system was specified in two retail units due to its optimal thermal performance. This allowed the floor construction depth to be minimised, providing an even transition for shoppers


entering from the concourse. With an insulation performance up to five times that of commonly used insulation materials, Kingspan OPTIM-R vacuum insulation panels (VIPs) provided a clear solution.


01544 387 384 www.kingspaninsulation.co.uk/optim-r Energy efficiency with Kingspan Kooltherm Morgan Sindall


The Pines Primary School in Red Lodge has been constructed to provide a flexible, adaptable and sustainable space for education, with the help of Kingspan Kooltherm K15 Rainscreen Board. The Kingspan Kooltherm K15 Rainscreen Board features a fibre-free rigid thermoset phenolic


core and offers thermal conductivities as low as 0.020 W/m·K. This allowed the U-value to be met with a slim external wall construction. In addition, all Kooltherm, Therma and KoolDuct insulation products and cavity closers manufactured at Kingspan Insulation’s facilities in Pembridge and Selby are certified to BES 6001 ‘Excellent’.


01544 387 384 www.kingspaninsulation.co.uk Door closer enhances fire safety in high-rise buildings


British designed and manufactured, Powermatic controlled, concealed door closers from Samuel Heath are gaining increasing popularity for use on fire doors in high-rise flats and apartments. The door closers carry the CE mark and have been independently tested and proved to meet the requirements for one hour and half-hour fire doors under BS EN 1634-1.


Unlike other jamb-mounted devices, Powermatic door closers facilitate a door’s compliance with Approved Document M, are the only Certifire jamb-mounted door closer and do not have to be removed from the door to be adjusted.


Totally concealed when the door is closed, the door closers also deliver a host of reliability, safety and performance benefits which make them perfect for high-rise buildings, such as flats, apartments and offices.


0121 766 4200 www.concealeddoorclosers.com HSBC banks on Hunter Douglas’ credentials


Hunter Douglas Architectural’s commitment to sustainability has led to HSBC’s new ring-fenced banking headquarters in Birmingham to become one of the greenest in the city. The HSBC UK building on Broad Street is the first in Birmingham to be constructed to


the Leadership in Energy and Environmental Design Gold accreditation standard. The international architectural products company supplied 600m2


of MDF grill finished in RAL9010 white. The panels, 25mm


wide and 115mm in height, were manufactured with a 120mm gap to create a modern and light, aesthetically pleasing look for the space.


01604 648229 www.hunterdouglas.co.uk NICEIC electrical accreditation for Offsite


Offsite Solutions has become one of the first bathroom pod manufacturers in the UK to achieve NICEIC Approved Contractor accreditation for electrical installations. It now has a dedicated team of engineers inhouse who are responsible for electrical


testing at its factory in Somerset. The Offsite Solutions electrical testing team demonstrated that they meet the stringent industry standards and regulations for the factory installation of electrics in bathroom pods. Its qualified supervisors have been assessed for competence in inspection and testing in accordance with BS 7671.


info@offsitesolutions.com


ADF JUNE 2019


WWW.ARCHITECTSDATAFILE.CO.UK


Page 1  |  Page 2  |  Page 3  |  Page 4  |  Page 5  |  Page 6  |  Page 7  |  Page 8  |  Page 9  |  Page 10  |  Page 11  |  Page 12  |  Page 13  |  Page 14  |  Page 15  |  Page 16  |  Page 17  |  Page 18  |  Page 19  |  Page 20  |  Page 21  |  Page 22  |  Page 23  |  Page 24  |  Page 25  |  Page 26  |  Page 27  |  Page 28  |  Page 29  |  Page 30  |  Page 31  |  Page 32  |  Page 33  |  Page 34  |  Page 35  |  Page 36  |  Page 37  |  Page 38  |  Page 39  |  Page 40  |  Page 41  |  Page 42  |  Page 43  |  Page 44  |  Page 45  |  Page 46  |  Page 47  |  Page 48  |  Page 49  |  Page 50  |  Page 51  |  Page 52  |  Page 53  |  Page 54  |  Page 55  |  Page 56  |  Page 57  |  Page 58  |  Page 59  |  Page 60  |  Page 61  |  Page 62  |  Page 63  |  Page 64  |  Page 65  |  Page 66  |  Page 67  |  Page 68  |  Page 69  |  Page 70  |  Page 71  |  Page 72  |  Page 73  |  Page 74  |  Page 75  |  Page 76  |  Page 77  |  Page 78  |  Page 79  |  Page 80  |  Page 81  |  Page 82  |  Page 83  |  Page 84  |  Page 85  |  Page 86  |  Page 87  |  Page 88  |  Page 89  |  Page 90  |  Page 91  |  Page 92