38 DRAINAGE & PLUMBING


PLASTIC: NOT JUST A PIPE DREAM


Richard Eddy of Polypipe offers advice on the best way to specify and use plastic-based systems on brownfield development sites.


Government’s highly anticipated Housing White Paper, and with housebuilding being a key issue in the recent elections. One of the Government’s key recent initiatives has been to propose a Brownfield Register, so developers can secure ‘planning permission in principle’ on previously used sites from local authorities.


T


While brownfield sites have been pushed for over 20 years by various governments and departments, progress has been slow, with issues such as land remediation costs and design issues hampering develop- ments. But, every year that passes with usable plots of land lying dormant, the pressure to get building increases as the demand for new houses creeps up. As reported in 2014 by Building Consultancy Daniel Watney, there are 10,000 hectares of brownfield land suitable for housing around England alone, which would support 467,000 homes.


Many developers are reluctant to take a risk on brownfield sites unless there is the opportunity to dictate more favourable terms at the outset of building, such as allowing higher density developments to increase the viability of a project. Often, the existing infrastructure in and around the site needs to be upgraded and developed to provide new modern access to


WITH THE CONSTRUCTION SECTOR BRACING ITSELF FOR A SKILLS SHORTAGE OVER THE COMING YEARS, PLASTIC BASED SOLUTIONS WILL BE INVALUABLE TO ENSURE A SMALLER WORKFORCE CAN KEEP A PROJECT ON TRACK WWW.HBDONLINE.CO.UK


his year, the housing crisis has been high on the news agenda, following the release of the


previously used sites, which adds to the outlay of any project.


One of the biggest issues facing developers at the outset of a brownfield site development is getting the drainage system right, in order for new housing units to be able to connect into existing sewerage networks.


Brownfield sites can cause headaches for designers and contractors alike, but using materials such as plastic piping can produce quicker installation times, onsite design flexibility and long term durability, offering developers the peace of mind to push ahead. Using plastic systems can also help to mitigate the prohibitive costs associated with building on brownfield


sites, and can offer practical solutions to complex design challenges.


Assessing the ground conditions across a brownfield site is, unsurprisingly, a crucial place to start. It is important that the topography of the ground is fully evaluated and that damaging chemical elements such as petroleum residues and tar deposits are removed during remediation.


By using products that hold the correct approvals, the risk of chemical degradation to the product is vastly mitigated. Plastic- based foul and surface water drainage pipes are designed to accommodate normal ground movement, and are tried and tested in all conditions to meet the required industry standards.


Importantly for brownfield sites, many plastic products are fully adaptable and compatible with existing drainage and sewer systems that may be encountered within brownfield sites, and are designed with a wide range of easy to use fittings and ancillaries. In addition, using plastic piping is ideal on sites where developers need to rely more on components manufactured offsite. Due to the often restrictive space of brownfield sites, transporting ready-made sections of a system to be installed directly onsite can make a big difference. Plastic is inherently lightweight, helping to reduce the costs of major plant equipment required on site, which also


Page 1  |  Page 2  |  Page 3  |  Page 4  |  Page 5  |  Page 6  |  Page 7  |  Page 8  |  Page 9  |  Page 10  |  Page 11  |  Page 12  |  Page 13  |  Page 14  |  Page 15  |  Page 16  |  Page 17  |  Page 18  |  Page 19  |  Page 20  |  Page 21  |  Page 22  |  Page 23  |  Page 24  |  Page 25  |  Page 26  |  Page 27  |  Page 28  |  Page 29  |  Page 30  |  Page 31  |  Page 32  |  Page 33  |  Page 34  |  Page 35  |  Page 36  |  Page 37  |  Page 38  |  Page 39  |  Page 40  |  Page 41  |  Page 42  |  Page 43  |  Page 44  |  Page 45  |  Page 46  |  Page 47  |  Page 48  |  Page 49  |  Page 50  |  Page 51  |  Page 52