GRID CONNECTIONS


FEATURE SPONSOR


Keeping You Powered


H&Askham, a leading provider of specialist high voltage electrical installation services are widely known in the offshore wind industry for engineering services provided for the installation and terminations and testing of inter-array and export cable systems. However, historically the business has its roots firmly on dry land carrying out installation and maintenance work serving the National Grid.


INVESTMENT


The company is making continued investment in developing their onshore services to support projects providing connections to the grid on a number of new power generation installations and system upgrades.


THE GRID


The UK’s infrastructure requires redevelopment and upgrade to cope with the surging demands on the National Grid. Furthermore with the evolution of a much more diverse range of power generation methods, comes the need for these new technologies to effectively connect to the grid with the critical objectives being to optimise performance and efficiency and maintain stability of the grid.


The stock of specialist plant now includes: 20T cable drum trailer, driven and static cable drum stands and jacks (<35T), cable pulling winches (<10T) and looped control electric driven cable pushers. The company continues to cultivate and develop their in-house skills and competencies with ongoing training for all, from site operatives and technicians to their Engineering and Management teams.


INNOVATION


The H&Askham team installed ABB Dry Type GIS (Gas Insulated Switchgear) Terminations at a substation which is fed from hydro power in Inveruglas, Loch Lomond, which supplies 160MW of power to the surrounding towns and villages. These terminations were the first of their type in the UK.


EXTRA HIGH VOLTAGE


Since successful completion the company has been awarded a number of contracts working on both the extra high voltage generation and distribution networks up to 400kV.


28


www.windenergynetwork.co.uk


Page 1  |  Page 2  |  Page 3  |  Page 4  |  Page 5  |  Page 6  |  Page 7  |  Page 8  |  Page 9  |  Page 10  |  Page 11  |  Page 12  |  Page 13  |  Page 14  |  Page 15  |  Page 16  |  Page 17  |  Page 18  |  Page 19  |  Page 20  |  Page 21  |  Page 22  |  Page 23  |  Page 24  |  Page 25  |  Page 26  |  Page 27  |  Page 28  |  Page 29  |  Page 30  |  Page 31  |  Page 32  |  Page 33  |  Page 34  |  Page 35  |  Page 36  |  Page 37  |  Page 38  |  Page 39  |  Page 40  |  Page 41  |  Page 42  |  Page 43  |  Page 44  |  Page 45  |  Page 46  |  Page 47  |  Page 48  |  Page 49  |  Page 50  |  Page 51  |  Page 52  |  Page 53  |  Page 54  |  Page 55  |  Page 56  |  Page 57  |  Page 58  |  Page 59  |  Page 60  |  Page 61  |  Page 62  |  Page 63  |  Page 64  |  Page 65  |  Page 66  |  Page 67  |  Page 68  |  Page 69  |  Page 70  |  Page 71  |  Page 72  |  Page 73  |  Page 74  |  Page 75  |  Page 76  |  Page 77  |  Page 78  |  Page 79  |  Page 80  |  Page 81  |  Page 82  |  Page 83  |  Page 84  |  Page 85  |  Page 86  |  Page 87  |  Page 88  |  Page 89  |  Page 90  |  Page 91  |  Page 92  |  Page 93  |  Page 94  |  Page 95  |  Page 96  |  Page 97  |  Page 98  |  Page 99  |  Page 100