CASE STUDY
London’s Strand Palace Hotel upgrades guest comfort with Mitsubishi Electric
An innovative, efficient air conditioning system has been chosen to provide cooling and comfort to guests at the Strand Palace Hotel in the heart of London.
T
he hotel, which is walking distance from some of London’s most famous theatres and has been welcoming guests since 1909, needed to modernise its heating and cooling systems to ensure a quality experience for guests.
High levels of energy efficiency and minimal disruption to the hotel’s operation during installation were also key considerations. The solution came in the form of the
unique Hybrid VRF (Variable Refrigerant Flow) system from Mitsubishi Electric, which offers simultaneous heating and cooling with full heat recovery. The combination of refrigerant and water
used in Hybrid VRF also delivers a much lower Global Warming Potential (GWP) than traditional VRF systems and saves around 30- 40% in refrigerant use in comparison. The fit-out was designed by Elementa
Consulting and installed by Working Environments and has seen units fitted across the hotel’s 790 rooms. The project started in September 2018 and is due for completion in April 2020, making the
46 April 2020
project the biggest of its kind in Europe. With an occupancy of 96% every day of the year, it was crucial that the hotel remained fully operational during installation to minimise loss of revenue and disruption to guests. Ted Connell, specifier and designer at
Elementa, said: “Many different systems were assessed, but the expertise of the Working Environment team combined with the modular installation of the Hybrid VRF made it stand out as the right option for The Strand. “It was possible to complete the installation floor by floor, even half a floor at a time where necessary, allowing the hotel to remain open during the process.”
The Hybrid VRF system also offers additional cost-saving benefits by removing the need for leak detection equipment. Refrigerant is only used between the outdoor condenser and a special Hybrid Branch Controller box (HBC).
From here, water is used to transfer heating or cooling to each room, removing the need for additional equipment or additional annual maintenance regimes.
www.acr-news.com
Page 1 |
Page 2 |
Page 3 |
Page 4 |
Page 5 |
Page 6 |
Page 7 |
Page 8 |
Page 9 |
Page 10 |
Page 11 |
Page 12 |
Page 13 |
Page 14 |
Page 15 |
Page 16 |
Page 17 |
Page 18 |
Page 19 |
Page 20 |
Page 21 |
Page 22 |
Page 23 |
Page 24 |
Page 25 |
Page 26 |
Page 27 |
Page 28 |
Page 29 |
Page 30 |
Page 31 |
Page 32 |
Page 33 |
Page 34 |
Page 35 |
Page 36 |
Page 37 |
Page 38 |
Page 39 |
Page 40 |
Page 41 |
Page 42 |
Page 43 |
Page 44 |
Page 45 |
Page 46 |
Page 47 |
Page 48 |
Page 49 |
Page 50 |
Page 51 |
Page 52