East Anglia THREE Offshore Windfarm
The table below sets out the key project design characteristics associated with the proposed East Anglia THREE Offshore Windfarm.
PROJECT CHARACTERISTIC Size
Windfarm capacity
Estimated no. of houses (equivalent)* Distance from Lowestoft Number of wind turbines
Minimum spacing between wind turbines Size of turbines
Maximum height of wind turbine Landfall of export cable Grid connection point
Number of convertor stations ONE 306km2
1,200 megawatts 821,273 45km
Up to 325 675 metres
3-8 megawatts 200 metres
To the south of Bawdsey
Bramford 1
THREE 305km2
1,200 megawatts 821,273 69km
100-172 675 metres
7-12 megawatts 247 metres
To the south of Bawdsey
Bramford 1
* Calculated using a 33.04% capacity factor (the UK average for offshore wind as supplied by DECC Digest of United Kingdom Energy Statistics) and an annual household consumption of 4,229 kW hours
Project timelines We intend to submit an application for consent for East Anglia THREE in November 2014. As with any project, these dates are subject to amendment throughout the development process.
Preliminary
Scoping request Q4 2012
Environmental Informaon
Report published Q2 2014
Applicaon submied Q4 2014
Planning decision 2016
12 34 56 7
Environmental Surveys commence and idenficaon of individual projects Q1 2010
East Anglia THREE timeline
Publicaon of The Statement of Community Consultaon (SoCC) Q3 2013
Construcon commence 2019/2020