GENSETS


Bells Power installed bulk storage fuel systems: 72 hours (tenants) and 24 hours (life safety), together with associated fuel control and pipework systems. A full hot / standby Allen Bradley PLC system with outstations at each switchboard was installed to control the mains operation of the building and cover any potential power sce- nario.


Power requirements for 2 New Ludgate involved the supply, installation and full commissioning of three further generator sets: two P2000P1 for tenants at Basement Level B1 and one P800P1 for life safety within an acoustic enclosure at roof level. Speaking about the project, James Murphy, Managing Director of Bells Power said: “The


scale of this project was huge, with both buildings being worked on at the same time. The main contractor, Skanska, was fully committed to a very ambitious programme, which meant working at night and through weekends on commissioning and IST activities.


“Both buildings are now fully occupied,


testament to the resilient infrastructure provided. We have since maintained a close working with Land Securities and have been selected for further projects: One New Street Square and Nova, Victoria. We’re now also a preferred supplier with Waterman’s and have since won numerous more projects with Skanksa.” Gary Tozer, Principal Electrical Engineer at


“Bells Power has given us excellent support for the design of the generator installation at Land


Securities’ projects 1 and 2 New


Ludgate.”


­ Gary Tozer, Principal Electrical Engineer at Waterman Building Services


MARCH ‐ APRIL 2017 UK POWER NEWS


Waterman Building Services told UKPN: “Bells Power has given us excellent support for the design of the generator installation at Land Securities’ projects 1 and 2 New Ludgate. They’ve a wealth of experience in delivering complex turnkey generator installation and this means they really understand the client’s requirements.” More information - visit: www.fgwilson.com www.bellspower.co.uk


19


Page 1  |  Page 2  |  Page 3  |  Page 4  |  Page 5  |  Page 6  |  Page 7  |  Page 8  |  Page 9  |  Page 10  |  Page 11  |  Page 12  |  Page 13  |  Page 14  |  Page 15  |  Page 16  |  Page 17  |  Page 18  |  Page 19  |  Page 20  |  Page 21  |  Page 22  |  Page 23  |  Page 24  |  Page 25  |  Page 26  |  Page 27  |  Page 28  |  Page 29  |  Page 30  |  Page 31  |  Page 32  |  Page 33  |  Page 34  |  Page 35  |  Page 36  |  Page 37  |  Page 38  |  Page 39  |  Page 40  |  Page 41  |  Page 42  |  Page 43  |  Page 44