CASE Study One framework solution, multiple displays By: Tecna UK
The T3 modular display system has the ability to be reconfigured with ease. So, your initial exhibition stand layout can be changed for multiple exhibitions, to create a different look for every event.
The brief We were approached to work in partnership with Ouno Creative, a multimedia and com- munications agency, on a project for their client, Manthorpe Group. The brief for this project involved two divisions of the Man- thorpe Group: Engineering and Building Products. Each division wanted the same features on their exhibition stands but in dif- ferent styles:
• Engineering: Farnborough International Air Show (FIA) – 10m x 7m 3 sides open stand
• Building Products: UK Construction Week, NEC – 12m x 12m Island stand
The brief required us to design two exhibi- tion stands, with the second stand using as much framework as possible from the first stand. The first event needed to include cus- tom elements to support a large 4x4 LED wall, plus generic meeting areas and prod- uct displays across both stands. The re- quirement also included a full turnkey solution including project management, pre- build, installation and dismantle.
The design Because the two divisions of Manthorpe Group required the same features on each stand, but in different styles, they tested the versatility of the T3 modular display system. The design process required a few initial meetings with Ouno Creative, which then lead into meetings with the Manthorpe Group.
The first exhibition was to be held at the Farnborough International Air Show (FIA). The Engineering division had purchased a 10m x 7m three open sided stand.
The key brief elements were: • Meeting area
• Large curved light box • 4x4 LED wall • Counter
• Storage room • Product areas
The design required a semi-private meeting area, which meant we had to close one of the open sides. This lead to conversations with the event organisers, as this was against the shows criteria to make sure lines of sight remain clear. To overcome this it was agreed by all parties that we could create a semi-transparent wall. This wall was created by integrating solid sheets of polycarbonate into the T3 framework.
After careful consideration, the best way for the wall to be created to support the 4x4 LED wall, would be to use our custom build contacts to work with combining wooden el- ements with T3. Ouno then engaged with Smart AV, who liaised directly with Tecna UK regarding the technical information required for T3, to blend seamlessly with the LED wall. And to be able to install and run the 4x4 LED wall.
48 Sign Update ISSUE 169 FEBRUARY 2017
Page 1 |
Page 2 |
Page 3 |
Page 4 |
Page 5 |
Page 6 |
Page 7 |
Page 8 |
Page 9 |
Page 10 |
Page 11 |
Page 12 |
Page 13 |
Page 14 |
Page 15 |
Page 16 |
Page 17 |
Page 18 |
Page 19 |
Page 20 |
Page 21 |
Page 22 |
Page 23 |
Page 24 |
Page 25 |
Page 26 |
Page 27 |
Page 28 |
Page 29 |
Page 30 |
Page 31 |
Page 32 |
Page 33 |
Page 34 |
Page 35 |
Page 36 |
Page 37 |
Page 38 |
Page 39 |
Page 40 |
Page 41 |
Page 42 |
Page 43 |
Page 44 |
Page 45 |
Page 46 |
Page 47 |
Page 48 |
Page 49 |
Page 50 |
Page 51 |
Page 52 |
Page 53 |
Page 54 |
Page 55 |
Page 56 |
Page 57 |
Page 58 |
Page 59 |
Page 60 |
Page 61 |
Page 62 |
Page 63 |
Page 64 |
Page 65 |
Page 66 |
Page 67 |
Page 68 |
Page 69 |
Page 70 |
Page 71 |
Page 72 |
Page 73 |
Page 74 |
Page 75 |
Page 76 |
Page 77 |
Page 78 |
Page 79 |
Page 80 |
Page 81 |
Page 82 |
Page 83 |
Page 84 |
Page 85 |
Page 86 |
Page 87 |
Page 88 |
Page 89 |
Page 90 |
Page 91 |
Page 92 |
Page 93 |
Page 94 |
Page 95 |
Page 96