specification over a period of six weeks. Another project


was to rebuild our par 3, 13th hole. Tom was briefed to design a signature island green on which to market the resort. Southern Golf were hired to shape and construct the green, and the end result is quite spectacular. We are still to


complete the final phase of the golf course renovation project. The work outstanding is the tidying, planting and


Irriplan Ltd, I walked the course to map out an improved irrigation system that would give complete and even water coverage. We needed around 300 new sprinklers to achieve this, but we could only budget for 150. Irrigation Control, along with my irrigation technician, Petros Almazidis, were contracted to carry out this project. The driving range was also given a


makeover, with a new weather shelter, office, toilet facility and fresh landscaping. I was asked to design and construct a practice putting green in order to complement the newly landscaped area. We completely built a 300m2


green from scratch to USGA


re-shaping of the golf course boundaries, as well as the landscaping and planting of the bare tee surrounds. We are currently in talks with the local


government to increase the capacity of our main reservoir in order to receive treated sewage effluent water from Paphos. Another requirement from the government is that the golf course needs to cover an area of 52 hectares in order for the licences to be approved for the main real estate project. As the golf course currently only covers an area of 40 hectares, we are planning to relocate holes ten and eleven as well as constructing a new 3-hole golf academy. This will involve


another mini-grow-in project, which I am eagerly looking forward too. I am very fortunate in that three of my


staff, Argyris Maratheftis, Costas Christodoulou and Sotiris Charalambous, speak very good English. Each morning, they help me with translating to the non-English speakers what jobs we have planned for the day and how we intend to do them. We employ one full time mechanic,


Gregoris Efthimiou. I have a young greenkeeper, Fotis Kotzias, who is also a qualified mechanic and can cover sufficiently when Gregoris is away for whatever reason. All staff make the normal pre-start checks to our machinery each morning and all maintenance is carried out in-house. I have a specialist irrigation technician,


Petros Almazidis, who is very capable when it comes to installing and maintaining our system to a high standard. The youngsters - Sotiris, Fotis and Pambos Charalambous - get the majority of the physical jobs as they tend to pay more attention to detail and are young and fit. The older guys - Argyris, Costas and Stelios Constantinou - tend to have the less demanding jobs, whilst I take on most of the important chemical and fertiliser application work myself. I aim to share the workload as much as


possible as I want to create a team of equals who work hard for each other. I have always followed the philosophy that “every man should be able to do every job” and my staff are all trained to be able to use every machine. I do not have a designated second


   


THE PROFESSIONALS CHOICE FOR SPORTS TURF IRRIGATION 


PC APRIL/MAY 2014 I 13


Page 1  |  Page 2  |  Page 3  |  Page 4  |  Page 5  |  Page 6  |  Page 7  |  Page 8  |  Page 9  |  Page 10  |  Page 11  |  Page 12  |  Page 13  |  Page 14  |  Page 15  |  Page 16  |  Page 17  |  Page 18  |  Page 19  |  Page 20  |  Page 21  |  Page 22  |  Page 23  |  Page 24  |  Page 25  |  Page 26  |  Page 27  |  Page 28  |  Page 29  |  Page 30  |  Page 31  |  Page 32  |  Page 33  |  Page 34  |  Page 35  |  Page 36  |  Page 37  |  Page 38  |  Page 39  |  Page 40  |  Page 41  |  Page 42  |  Page 43  |  Page 44  |  Page 45  |  Page 46  |  Page 47  |  Page 48  |  Page 49  |  Page 50  |  Page 51  |  Page 52  |  Page 53  |  Page 54  |  Page 55  |  Page 56  |  Page 57  |  Page 58  |  Page 59  |  Page 60  |  Page 61  |  Page 62  |  Page 63  |  Page 64  |  Page 65  |  Page 66  |  Page 67  |  Page 68  |  Page 69  |  Page 70  |  Page 71  |  Page 72  |  Page 73  |  Page 74  |  Page 75  |  Page 76  |  Page 77  |  Page 78  |  Page 79  |  Page 80  |  Page 81  |  Page 82  |  Page 83  |  Page 84  |  Page 85  |  Page 86  |  Page 87  |  Page 88  |  Page 89  |  Page 90  |  Page 91  |  Page 92  |  Page 93  |  Page 94  |  Page 95  |  Page 96  |  Page 97  |  Page 98  |  Page 99  |  Page 100  |  Page 101  |  Page 102  |  Page 103  |  Page 104  |  Page 105  |  Page 106  |  Page 107  |  Page 108  |  Page 109  |  Page 110  |  Page 111  |  Page 112  |  Page 113  |  Page 114  |  Page 115  |  Page 116  |  Page 117  |  Page 118  |  Page 119  |  Page 120  |  Page 121  |  Page 122  |  Page 123  |  Page 124  |  Page 125  |  Page 126  |  Page 127  |  Page 128  |  Page 129  |  Page 130  |  Page 131  |  Page 132  |  Page 133  |  Page 134  |  Page 135  |  Page 136  |  Page 137  |  Page 138  |  Page 139  |  Page 140  |  Page 141  |  Page 142  |  Page 143  |  Page 144  |  Page 145  |  Page 146  |  Page 147  |  Page 148  |  Page 149  |  Page 150  |  Page 151  |  Page 152  |  Page 153  |  Page 154  |  Page 155  |  Page 156