This page contains a Flash digital edition of a book.
Production • Processing • Handling


If it should be tailor-made, it will be!


Andreas Voss looks at the benefits of customised piping solutions. B


etter operating performance, streamlined design for tight access areas, delivery times as short as possible – hydraulic equipment manufacturers are confronted with all these constantly increasing


requirements for improving the efficiency of their hydraulic systems. And all this at a time when cost pressures are already high and even increasing. With its Complete Piping Solution System,


Parker can now offer designers an interesting solution for these challenges. Higher pressure is associated with this demand for improved hydraulic system efficiency and higher pressure in turn implies systems that are reliable. On this point, Parker can assure users that all its fittings and flange components are designed as standard with a safety


factor of 4. Moreover, these products have been certified by the leading classification societies. After detailed discussions with the


customer, Parker engineers develop a design that accommodates tight installation space, or recommend to the user the adoption of special components such as blocks or manifolds. Te object of the exercise is to significantly reduce the number of individual components. As and when they are required, the customer can put together the appropriate construction blocks from the Complete Piping Solution System. Tis makes it possible for Parker to deliver installation- ready piping systems and kits. Installation times are substantially reduced with these pre-manufactured components. To avert the risk of machine down-


Fig. 1. Flange connectors are produced using the latest CNC-controlled pipe bending technology


78 www.engineerlive.com


Page 1  |  Page 2  |  Page 3  |  Page 4  |  Page 5  |  Page 6  |  Page 7  |  Page 8  |  Page 9  |  Page 10  |  Page 11  |  Page 12  |  Page 13  |  Page 14  |  Page 15  |  Page 16  |  Page 17  |  Page 18  |  Page 19  |  Page 20  |  Page 21  |  Page 22  |  Page 23  |  Page 24  |  Page 25  |  Page 26  |  Page 27  |  Page 28  |  Page 29  |  Page 30  |  Page 31  |  Page 32  |  Page 33  |  Page 34  |  Page 35  |  Page 36  |  Page 37  |  Page 38  |  Page 39  |  Page 40  |  Page 41  |  Page 42  |  Page 43  |  Page 44  |  Page 45  |  Page 46  |  Page 47  |  Page 48  |  Page 49  |  Page 50  |  Page 51  |  Page 52  |  Page 53  |  Page 54  |  Page 55  |  Page 56  |  Page 57  |  Page 58  |  Page 59  |  Page 60  |  Page 61  |  Page 62  |  Page 63  |  Page 64  |  Page 65  |  Page 66  |  Page 67  |  Page 68  |  Page 69  |  Page 70  |  Page 71  |  Page 72  |  Page 73  |  Page 74  |  Page 75  |  Page 76  |  Page 77  |  Page 78  |  Page 79  |  Page 80  |  Page 81  |  Page 82  |  Page 83  |  Page 84  |  Page 85  |  Page 86  |  Page 87  |  Page 88  |  Page 89  |  Page 90  |  Page 91  |  Page 92  |  Page 93  |  Page 94  |  Page 95  |  Page 96  |  Page 97  |  Page 98  |  Page 99  |  Page 100