same rate. This is not the case with metal add-on expansion joints. Signature’s expansion joints also connect to their pitch covers with the same connection systems as the fl ooring, making for a fully integrated contiguous surface. Thermal expansion is a frustrating fact of life, but Signature Systems engineers solutions that prevent these problems at every price point. With other providers, expansion joints may only be offered for their most expensive systems, if at all.


Turnkey approach


Due to the complexity of the trackway installations at Stade de France, Signature provided in-depth CAD drawings showing precisely where each ArmorDeck 1 panel would be placed relative to the ArmorDeck 3, where the expansion joints would be placed relative to lighting towers and peninsula stages, and to calculate the quantities of each component required for each performance. Because the lighting and staging setups for each concert were slightly different, Signature provided separate custom CAD drawings for the event organiser’s approval, which were


in turn used by the installation team to ensure proper placement.


Signature’s turnkey approach of designing the layout, providing logistics, and handling the installation and breakdown for the event all proved to be a huge success. The logistics and installation were orchestrated by the same project managers and operations professionals responsible for Signature’s


Signature Systems personnel lay the temporary fl ooring at Stade de France


work at 25 venues of the London 2012 Olympics, including the Opening and Closing Ceremonies. Signature’s products are designed to be easily installed by unskilled labour, but their experienced team allowed concert organisers to rest assured from consultation and design through installation and removal, that their pitch was properly protected and their guests would have a safe and comfortable experience. 


Stade de France 1 Stadium


7 Artists 8 Performances


8,925m2 ArmorDeck Protection


450 Expansion Joints 320 Transition Ramps 18 Installers 9 Hours per Installation


Stade de France’s heavy concert schedule requires the pitch and track to be regularly covered.


84


SHOWCASE play


Page 1  |  Page 2  |  Page 3  |  Page 4  |  Page 5  |  Page 6  |  Page 7  |  Page 8  |  Page 9  |  Page 10  |  Page 11  |  Page 12  |  Page 13  |  Page 14  |  Page 15  |  Page 16  |  Page 17  |  Page 18  |  Page 19  |  Page 20  |  Page 21  |  Page 22  |  Page 23  |  Page 24  |  Page 25  |  Page 26  |  Page 27  |  Page 28  |  Page 29  |  Page 30  |  Page 31  |  Page 32  |  Page 33  |  Page 34  |  Page 35  |  Page 36  |  Page 37  |  Page 38  |  Page 39  |  Page 40  |  Page 41  |  Page 42  |  Page 43  |  Page 44  |  Page 45  |  Page 46  |  Page 47  |  Page 48  |  Page 49  |  Page 50  |  Page 51  |  Page 52  |  Page 53  |  Page 54  |  Page 55  |  Page 56  |  Page 57  |  Page 58  |  Page 59  |  Page 60  |  Page 61  |  Page 62  |  Page 63  |  Page 64  |  Page 65  |  Page 66  |  Page 67  |  Page 68  |  Page 69  |  Page 70  |  Page 71  |  Page 72  |  Page 73  |  Page 74  |  Page 75  |  Page 76  |  Page 77  |  Page 78  |  Page 79  |  Page 80  |  Page 81  |  Page 82  |  Page 83  |  Page 84  |  Page 85  |  Page 86  |  Page 87  |  Page 88  |  Page 89  |  Page 90  |  Page 91  |  Page 92  |  Page 93  |  Page 94  |  Page 95  |  Page 96  |  Page 97  |  Page 98  |  Page 99  |  Page 100  |  Page 101  |  Page 102  |  Page 103  |  Page 104  |  Page 105  |  Page 106  |  Page 107  |  Page 108  |  Page 109  |  Page 110  |  Page 111  |  Page 112  |  Page 113  |  Page 114  |  Page 115  |  Page 116  |  Page 117  |  Page 118  |  Page 119  |  Page 120  |  Page 121  |  Page 122  |  Page 123  |  Page 124  |  Page 125  |  Page 126  |  Page 127  |  Page 128  |  Page 129  |  Page 130  |  Page 131  |  Page 132  |  Page 133  |  Page 134  |  Page 135  |  Page 136  |  Page 137  |  Page 138  |  Page 139