“T e bottom line is, the PPAP is a time stamp of what the supplier did when it made this part and it is a living document that is reviewed and updated periodically,” Helgeson said. “For instance, when an engineer changes a part, he can go back and look at the history of the PPAP and see what the issues were that might be a concern to him, as well.” Caterpillar will review the PPAP if it sees a dimensional trend in the castings it receives, where a dimension is drifting and the measurements are diff erent than expected. In the review, the supplier and Caterpillar may fi nd if control of a process is slipping or if tool wear is occurring. “T e PPAP is not just done once and then put away,” Helgeson said. Dimensional results aren’t the only


measurement examined. Caterpillar pays close attention to metallurgical results, as well. T ese can be addressed in PPAP documentation. “Due to the additional strength


requirements of the applications being developed, the metallurgical results are just as important, and many times the casting supplier may not pay as much attention to those,” Helgeson said. “T e yield strength, hardness, fatigue strength, excessive wear, etc., are all very critical in the application, depending on the type of metal and application.”


Roles and Review At Caterpillar, the PPAP is evalu-


ated by three parties—engineering, pro- cess engineering and quality, and each party is focused on diff erent sections. Engineering evaluates whether the


part is defi ned correctly, the FMEA is current and complete and critical char- acteristics are appropriately defi ned. Engineering also checks that it can trace key elements of the FMEA and critical characteristics through to the control plan. T e process control engineer/


manufacturing engineer is responsible for making sure all the elements are complete and reviewed. Quality evalu- ates sample inspection and measure- ment correlation, determines whether appropriate lab tests and analysis are complete and reviews the inspection and control plans.


Jul/Aug 2013 | METAL CASTING DESIGN & PURCHASING | 35


Process fl ow diagrams are required in Section 2 of the PPAP.


Page 1  |  Page 2  |  Page 3  |  Page 4  |  Page 5  |  Page 6  |  Page 7  |  Page 8  |  Page 9  |  Page 10  |  Page 11  |  Page 12  |  Page 13  |  Page 14  |  Page 15  |  Page 16  |  Page 17  |  Page 18  |  Page 19  |  Page 20  |  Page 21  |  Page 22  |  Page 23  |  Page 24  |  Page 25  |  Page 26  |  Page 27  |  Page 28  |  Page 29  |  Page 30  |  Page 31  |  Page 32  |  Page 33  |  Page 34  |  Page 35  |  Page 36  |  Page 37  |  Page 38  |  Page 39  |  Page 40  |  Page 41  |  Page 42  |  Page 43  |  Page 44  |  Page 45  |  Page 46  |  Page 47  |  Page 48  |  Page 49  |  Page 50  |  Page 51  |  Page 52  |  Page 53  |  Page 54  |  Page 55  |  Page 56  |  Page 57  |  Page 58  |  Page 59  |  Page 60