STATE & MUNICIPAL


Polk County Rural Public Power District, Stromsburg, Neb. Completed in July 2011, the power district features offi ces, a shop and warehouse. The project con- sists of three additions divided into four phases. The construction took place while the building owner maintained occupancy. This project also included a standing seam re-roof to the existing building, as well as insulating and sheeting the ex- isting exposed masonry walls. The 17,089-square- foot facility contains a Behlen ZL-24 Galvalume standing seam roof system and metal building system from Behlen Building Systems. The project also consists of metal wall panels in light stone from TransAmerican Strukturoc Inc.


General contractor/erector: B-D Construction Inc., Columbus, Neb. Architect: Cannon, Moss, Brygger Architects, Grand Island, Neb. Metal building and roof system: Behlen Building Systems, Columbus, www.behlenbuidingsystems.com, Circle #72 Metal wall panels: TransAmerican Strukturoc Inc., Eagan, Minn., www.strukturoc.com, Circle #73


Grow up! Add free space by going up instead of out.


Faster Permit Process with the versatile FCP ConnectRite™ system.


FCP ConnectRite™ system is the only one of its kind currently approved by the American Iron and Steel Institute (AISI). ConnectRite™ is now part of the California Building Code (CBC) and the International Building Code (IBC) providing approval for use in all seismic zones.


The ConnectRite™ system can expedite the permit process due to its acceptance


and being part of the IBC and CBC. Obtaining a permit in less time saves resources, provides a faster return on capital investment and eliminates the inconvenience caused by the numerous plan check corrections that can often be part of a prolonged permit approval.


 Our bolt-together connection can be designed to work with all Metal Building Systems.


The free-standing design does not require attachment to any part of your metal


building system and the ConnectRite™ system eliminates the need for footings in many applications.


 From Concept to Completion FCP offers complete engineered platforms for storage,


offi ce, and equipment applications, including multi-level systems. FCP also offers all required decking options, stairs, guardrail, gates and more.


FCP Inc. 23100 Baxter Road Wildomar, CA 92595 (800)807-2276 (805)684-1117 www.FCPMezzanine.com


circle #23 on reader service card


There is simply no better snow retention system than S-5!®


ColorGard® !


Often imitated, never duplicated. Our patented S-5!® round-point setscrews, make ColorGard®


clamps, with their the strongest, easiest to install,


and best priced solution for standing seam metal roofs. They never pierce the paneling... and there is no messy glue! Unlike all other snow retention products, the perfect color-match of ColorGard ensures your snow retention system will always look great, and will last as long as your roof.


 *See optional Limited Lifetime Warranty information at www.S-5-ColorGard.com/mcn


June 2012 METAL CONSTRUCTION NEWS 45 circle #24 on reader service card


Page 1  |  Page 2  |  Page 3  |  Page 4  |  Page 5  |  Page 6  |  Page 7  |  Page 8  |  Page 9  |  Page 10  |  Page 11  |  Page 12  |  Page 13  |  Page 14  |  Page 15  |  Page 16  |  Page 17  |  Page 18  |  Page 19  |  Page 20  |  Page 21  |  Page 22  |  Page 23  |  Page 24  |  Page 25  |  Page 26  |  Page 27  |  Page 28  |  Page 29  |  Page 30  |  Page 31  |  Page 32  |  Page 33  |  Page 34  |  Page 35  |  Page 36  |  Page 37  |  Page 38  |  Page 39  |  Page 40  |  Page 41  |  Page 42  |  Page 43  |  Page 44  |  Page 45  |  Page 46  |  Page 47  |  Page 48  |  Page 49  |  Page 50  |  Page 51  |  Page 52  |  Page 53  |  Page 54  |  Page 55  |  Page 56  |  Page 57  |  Page 58  |  Page 59  |  Page 60