This page contains a Flash digital edition of a book.
Tunnel Vision?


Our HoldFast Road Rail Highway prevents a 140 mile diversion


At 7.10am 20th March 2012 the first convoy of cars drove along part of the west coast line running next to the A890 Lochcarron to Kyle road at Stromeferry, which was closed in December after a series of landslides. Installed by Level Crossing Installations.


Visit www.holdfastsolutions.com for more on this story.


Challenge HoldFast


Please contact Mark Coates Smith Mobile: +447970 656143 Fax: +441285 720748 Email: mark@holdfastsolutions.co.uk HoldFast Level Crossings Ltd, Brockenhurst, Chedworth, Cheltenham, GL54 4AA


Rosehill Polymers Ltd manufacture the HoldFast system on behalf of HoldFast Level Crossings Ltd


Page 1  |  Page 2  |  Page 3  |  Page 4  |  Page 5  |  Page 6  |  Page 7  |  Page 8  |  Page 9  |  Page 10  |  Page 11  |  Page 12  |  Page 13  |  Page 14  |  Page 15  |  Page 16  |  Page 17  |  Page 18  |  Page 19  |  Page 20  |  Page 21  |  Page 22  |  Page 23  |  Page 24  |  Page 25