Tunnel Vision?
Our HoldFast Road Rail Highway prevents a 140 mile diversion
At 7.10am 20th March 2012 the first convoy of cars drove along part of the west coast line running next to the A890 Lochcarron to Kyle road at Stromeferry, which was closed in December after a series of landslides. Installed by Level Crossing Installations.
Visit
www.holdfastsolutions.com for more on this story.
Challenge HoldFast
Please contact Mark Coates Smith Mobile: +447970 656143 Fax: +441285 720748 Email:
mark@holdfastsolutions.co.uk HoldFast Level Crossings Ltd, Brockenhurst, Chedworth, Cheltenham, GL54 4AA
Rosehill Polymers Ltd manufacture the HoldFast system on behalf of HoldFast Level Crossings Ltd