HYDRONICS RADIANT DESIGNS
Prefabrication: A key to higher quality and profit
BY JOHN ABULARRAGE CONTRIBUTING WRITER
important benefits. Prefabrication also presents some challenges, however, and it requires close attention to detail and a highly organized approach.
P 60
Advantages abound It is generally accepted that prefabrication can save
50% or more in labor costs over site fabrication. It provides the ability to meet demanding schedule deadlines by allowing fabrication in advance of field availability. At times, we have had as many as a half dozen control panels prefabricated in our shop, waiting for the appropriate time for installation. This solves the problem created by the “wait and hurry up” jobs that would otherwise be impossible to complete in a timely manner. Prefabrication provides a controlled and comfortable
work environment with all the necessary tools at your disposal. It prevents the repetitive setup and breakdown on a daily basis usually required with field fabrication. On long distance jobs, prefabrication can reduce travel time and expense. It also permits unrestricted work hours, not subject to the time constrictions that may exist on a given jobsite. Ultimately, the quality of prefabricated work is much higher than the quality that can usually be achieved in the field. A less evident benefit of prefabrication is training.
Mentoring an apprentice under shop conditions with real- world applications is priceless. It acts as a bridge between the classroom and the field. I’ve found that the ability to train from theory through development to fabrication and, finally, to the installation of a control panel to be a most effective training methodology.
Planning is key
The prefabrication process is best accomplished with continuity of responsibility. If the same person is performing the site survey, fabrication and installation, any conflicts can be readily identified and remediated. Coordination and communications with related trades is also
streamlined. The process of prefabrication always begins with accurate measurement of the space available
for the prefabricated equipment. You need to avoid what is referred to in the data processing industry as “garbage in, garbage out.” The last thing you want to happen is to deliver a prefabricated control
panel that is larger than the available space to a jobsite. Once the site survey is complete, it’s time to generate an accurate CAD drawing of the floor and
wall space available for all of the system components, including control panels, boilers, tanks and supply and return piping that will connect to
refabrication is by no means a new concept. It has existed in the industry for more than 50 years and, although it is underutilized, it offers a number of
the control panel. This drawing must include any equipment from other trades that needs to be in the mechanical room. Access for servicing of the equipment is critical and needs to be documented in the drawing as well. Starting from an accurate piping schematic, the basic
layout of the fittings and components can begin. There are always many variations of the layout that can affect the overall dimension of the panel. Sequencing either vertically or horizontally can make a tremendous difference in dimensions in either direction. It always
seems to amaze me that, regardless of how much space is available, it so often comes down to a matter of inches in order to make a control panel fit in the allotted space. When laying out the components, consideration must
be given to the hangers that will support the system. This sometimes requires adding additional length to piping between components to accommodate the hangers. Once the layout is decided, all dimensions must be confirmed with the mechanical room drawing. Then the actual assembly can begin.
The professional touch At this stage, decisions can be made about the
alignment of valves and components. While this alignment has little effect on the performance of the system, it adds to the overall cohesiveness of the finished project, without adding significant time to the fabrication. This visually important refinement communicates a high level of craftsmanship and professionalism. Don’t dismiss the value of this as merely “mechanical vanity.” Anyone who is impressed with the finished product will add that all important word-of-mouth element to your sales efforts. While prefabrication is not for every situation, it can be
an important key to higher quality and profit for every contractor. Almost every job offers the opportunity to prefabricate some aspect of it. If you have not tried prefabrication yet, start with a simple subsystem that you have typically fabricated in the field. Take your time. As you develop the shop techniques, the efficiency will follow, and the rewards will offset the investment in the learning curve many times over. l
phc april 2011
www.phcnews.com
Page 1 |
Page 2 |
Page 3 |
Page 4 |
Page 5 |
Page 6 |
Page 7 |
Page 8 |
Page 9 |
Page 10 |
Page 11 |
Page 12 |
Page 13 |
Page 14 |
Page 15 |
Page 16 |
Page 17 |
Page 18 |
Page 19 |
Page 20 |
Page 21 |
Page 22 |
Page 23 |
Page 24 |
Page 25 |
Page 26 |
Page 27 |
Page 28 |
Page 29 |
Page 30 |
Page 31 |
Page 32 |
Page 33 |
Page 34 |
Page 35 |
Page 36 |
Page 37 |
Page 38 |
Page 39 |
Page 40 |
Page 41 |
Page 42 |
Page 43 |
Page 44 |
Page 45 |
Page 46 |
Page 47 |
Page 48 |
Page 49 |
Page 50 |
Page 51 |
Page 52 |
Page 53 |
Page 54 |
Page 55 |
Page 56 |
Page 57 |
Page 58 |
Page 59 |
Page 60 |
Page 61 |
Page 62 |
Page 63 |
Page 64 |
Page 65 |
Page 66 |
Page 67 |
Page 68 |
Page 69 |
Page 70 |
Page 71 |
Page 72 |
Page 73 |
Page 74 |
Page 75 |
Page 76 |
Page 77 |
Page 78 |
Page 79 |
Page 80 |
Page 81 |
Page 82 |
Page 83 |
Page 84