search.noResults

search.searching

dataCollection.invalidEmail
note.createNoteMessage

search.noResults

search.searching

orderForm.title

orderForm.productCode
orderForm.description
orderForm.quantity
orderForm.itemPrice
orderForm.price
orderForm.totalPrice
orderForm.deliveryDetails.billingAddress
orderForm.deliveryDetails.deliveryAddress
orderForm.noItems
BUILDINGS,MAINTENANCE & REFURBISHMEN T McAV


AVOYwins place on new


£500mpublic sector framework C


rown Commercial Service (CCS) has awarded four lots on its new £500m Modular Building Solutions framework to TheMcAvoy Group. CCS is the largest public sector procurement organisation i Under the new agreement,McAvoy has secu


bespoke modular buildings and interim hire facilities with a particular focus on education and healthcare.


It will operate for the next four years and covers England, Scotland,Wales and Northern Ireland.


HAMMERING HOME THE NEED FOR SOPHISTICAT ACCOMMODAT


ATED STUDENT ATION W


ith the standard repetitive fixtures and fittings no longer ticking the box for student accommodation design,Maxwell Green Design Ltd enlisted the help of Forbo Flooring Systems to breathe a new lease of life into the communal areas of iQ Student Accommodation’s new property in Hammersmith, London.


various study and break out areas, while complementing striped design that would lead the eye naturally through a plank format.With this choice, we were able to create


pops used throughout. ” wwwforbo-flooring.co.uk/ ww.fo k/education


Lisa Green, Director ofMaxwell Green Design Ltd, commented: “Within the communal area, there were many different spaces, such as a games room, study area and even a cinema room, which all required their own identity, yet needed to be connected seamlessly. As such, within the main Atrium space, we specified Forbo’s Tessera Layout and Outline carpet tiles in a bold, monochrome the space and to the the neon colour


modular building solutions which have a design


was successful in The Group


number of major winning a


free school projects under


the previous CCS modular building contract which were built


In addition to offsite.


the Group’s


life of up to 60 years, the permanent


provision of high-quality interim accommodation for hire allows schools, hospitals and other organisations to react quickly to changing local needs. McAvoy can provide decent facilities for redevelopment projects and buildings to help meet short-term peaks in service demand, such as additional classrooms.


www.mcavoygroup.com 028 8774 0372 info


fo@mcavoygroup.com


red the opportunity to provide n the UK.


THE SMART CHOICE FOR EDUCAT


ATION


Highly durable perfe ct for the busy educa tion environment


y Cost-effective


thousands of schools, colleges and universities Over one million me ters square instal led in


sales@heckmondwike-fb.co.uk | 0 Get in touch


WIN 1924 410544 www.heckmondwike-fb.co.uk/summer


Logo mat value of up to £1,000, does not include installation. *Only available June, July and August 201 9.


July/ y/August 2019


A BESPO KE LOGO MAT


AT when you order fre r free samp le card quoting ‘‘SUMMER’*


www.education-today.co.uk 73


48 HOUR DE IL VERY GUARANTEED


Page 1  |  Page 2  |  Page 3  |  Page 4  |  Page 5  |  Page 6  |  Page 7  |  Page 8  |  Page 9  |  Page 10  |  Page 11  |  Page 12  |  Page 13  |  Page 14  |  Page 15  |  Page 16  |  Page 17  |  Page 18  |  Page 19  |  Page 20  |  Page 21  |  Page 22  |  Page 23  |  Page 24  |  Page 25  |  Page 26  |  Page 27  |  Page 28  |  Page 29  |  Page 30  |  Page 31  |  Page 32  |  Page 33  |  Page 34  |  Page 35  |  Page 36  |  Page 37  |  Page 38  |  Page 39  |  Page 40  |  Page 41  |  Page 42  |  Page 43  |  Page 44  |  Page 45  |  Page 46  |  Page 47  |  Page 48