search.noResults

search.searching

dataCollection.invalidEmail
note.createNoteMessage

search.noResults

search.searching

orderForm.title

orderForm.productCode
orderForm.description
orderForm.quantity
orderForm.itemPrice
orderForm.price
orderForm.totalPrice
orderForm.deliveryDetails.billingAddress
orderForm.deliveryDetails.deliveryAddress
orderForm.noItems
:


::


::


::


:


Underfloor heating


heating perfect Pitch


heatin T


at the Zalaegerszeg football ground in H materials, for the under-pitch heating ins heat transfer fluid made from renewable theselection of select Greenway Neo, an


was designed to host fo can accommodate 11,2 stadium (ZTE Are


A reduction in the environmental impact in the event of a leak or failure of the pipes, led


innovative e raw


stallation ungary


he recently renovated 11,200 capacity Zalaegerszeg football na) in Hungary 00 people and ootballmatches,


of a network of plastic pipes under the even in winter, through


pipes under the the installation


pitch which protect against frost. The invitation to tender for the


widened its scope to undertake the complete renovation of sports grounds renovation of the football pitch was won by Pharos '95 Kft which has


satisfaction of its customers by creating quality modern sports surfaces. The company has been working hard to grow the confidence and using synthetic or natural grass coverings.


To select the appropriate heat transfer fluid for the Zalaegerszeg football The company continually monitors the condition of the grounds.


Simon Sándor, Climalife commercial engineer presented Nagy Benedek, ground, Pharos '95 Kft contacted Climalife for an innovative solution.


transfer fluids, Climalife also offered Greenway Neo which ismade from the heating of grass pitches. As well as the traditional glycol-based heat technical director of Pharos '95, with various heat transfer fluids suited to


department reviewed the technical parameters of the equipment located in manufacturing the pipe system and Climalife, the engineering and design Following ameeting between the football pitch designer, the company vegetable-based renewable rawmaterials.


the cross-section of the pipework between the machine room and the sports properly. Based on the dimensions of the sports field, the machine room and transfer fluid, as these needed to be compatible for the systemto operate the machine room and the thermodynamic characteristics of the heat


made to use Greenway Neo as it was themost appropriate solution for the During a final discussion with staff at Pharos '95 Kft, the choice was field, Sándor was able to determine the total volume of the system.


staff and the owner. Although the technical aspect was important, the environmental protection gave the project even greater importance as in the event of a leak or failure of the pipes, it was essential to greatly reduce any


The football ground heating systemwas completed in 2017 and has damage caused to the grass and the soil.


operated without any problems since. www.heatingandventilating.net


ng


Page 1  |  Page 2  |  Page 3  |  Page 4  |  Page 5  |  Page 6  |  Page 7  |  Page 8  |  Page 9  |  Page 10  |  Page 11  |  Page 12  |  Page 13  |  Page 14  |  Page 15  |  Page 16  |  Page 17  |  Page 18  |  Page 19  |  Page 20  |  Page 21  |  Page 22  |  Page 23  |  Page 24  |  Page 25  |  Page 26  |  Page 27  |  Page 28  |  Page 29  |  Page 30  |  Page 31  |  Page 32  |  Page 33  |  Page 34  |  Page 35  |  Page 36  |  Page 37  |  Page 38  |  Page 39  |  Page 40  |  Page 41  |  Page 42  |  Page 43  |  Page 44  |  Page 45  |  Page 46  |  Page 47  |  Page 48