search.noResults

search.searching

dataCollection.invalidEmail
note.createNoteMessage

search.noResults

search.searching

orderForm.title

orderForm.productCode
orderForm.description
orderForm.quantity
orderForm.itemPrice
orderForm.price
orderForm.totalPrice
orderForm.deliveryDetails.billingAddress
orderForm.deliveryDetails.deliveryAddress
orderForm.noItems
Hospitals & healthcare


www.heatingandventilating.net


Perfecting hot water delivery


Clifton Park Hospital in York, advised by A J Gastech, has chosen Rinnai to upgrade its hot water heating system to meet the increasing demand whilst staying economically and environmentally efficient


department with X-ray facilities and on-site physiotherapy, including a small gym area. In 2018, the hospital opened a new outpatient department with 11 consulting rooms, two treatment rooms and X-ray facilities. Clifton Park prides itself on


C


offering exceptional care and service to all its patients and currently has a 5-star rating on NHS Choices, 4-star rating on Google and 4.7 rating on Facebook reviews. In the most recent survey - NHS Family & Friend’s Test – 100% of


inpatients and 98% of outpatients recommend the hospital. The new water heating system


features three Rinnai HDC 1200i plus a 500 litre cylinder. A Rinnai HD50i looked after the hot water demand for 10 years, without missing a beat, but due to expansion at the hospital, a new bespoke system was required. The decision was taken to upgrade to more


energy efficient condensing hot water heaters and incorporate the 500 litre storage vessel to give the hospital a means of dealing with peak hour demands. The heating engineer contractor, A J Gastech, was given just a 14- hour window in which to remove the existing system and replace it with the new one. This was achieved with a bit of time to spare. AJ Gastech offers services from installation to maintenance contracts with the variety of works involving sites throughout the UK for both public and private sector works. Adam Stante for A J Gastech, says: “We are based in Bradford, the heart of


Yorkshire, and we have a dedicated team of specialists that work throughout the UK, delivering high spec projects on time and on budget. Our standards are of the highest quality, cost effectiveness and to our clients’ approval.” The Rinnai HDC 1200i continuous model is for use on all high demand sites as it is capable of delivering 2,000 litres per hour. It guarantees significant levels of efficiency and hot water delivery for the


lifton Park Hospital, opened in 2006, has first-class medical facilities including 24 beds, two theatres, a day case unit, a large outpatient


end user whilst streamlining installations and guaranteeing future regulatory compliance. This is a precision engineered water heating unit which can also be combined as multiple units into one single, easy to handle module. Both HDC1200 internal and external models turn in an energy performance of 107% net efficiency and offer significant ranges of modulation as the system’s internal analytical system can modulate the burner range from 54kW to 2.4kW. The Rinnai HDC 1200i is engineered for minimal energy wastage and maximum energy performance. It is worth remembering that


Part L of the Building Regulations 2013 set minimum thermal efficiency levels of 90% for natural and 92% for LPG, consequently outlawing non-condensing gas fired water heaters for use in new build projects.


Rinnai units and systems are now the number one choice for large buildings and businesses with a heavy demand for constant hot water or where high


peaks of demand occur at certain times. Any number of modules can be manifolded, so the water handling capacity is infinite and there is no risk of the ‘cascade’ of hot water ever running out.


The manifolded 1200i units can be delivered direct to site in one


complete, easy to manage package and at a competitive price. For the end user this guarantees cost savings over other forms of hot water generation. The relatively compact footprint of all Rinnai units and systems means it can optimise plant room space and safeguard accessibility for maintenance and servicing. There is huge potential for on-demand style water heaters to play their part in both new build and in refurbishments where there are still many old systems that need replacing as well as old-style gravity fed water systems that use stored hot water. As Clifton Park Hospital has a secondary flow and return system, complete


range modulation is experienced ensuring that the system is running at optimum performance at all times.


There is huge potential for on-demand style water heaters to play their part in both new build and in refurbishments where there are still many old systems that need replacing as well as old-style gravity fed water systems that use stored hot water


 May 2019 www.heatingandventilating.net


Page 1  |  Page 2  |  Page 3  |  Page 4  |  Page 5  |  Page 6  |  Page 7  |  Page 8  |  Page 9  |  Page 10  |  Page 11  |  Page 12  |  Page 13  |  Page 14  |  Page 15  |  Page 16  |  Page 17  |  Page 18  |  Page 19  |  Page 20  |  Page 21  |  Page 22  |  Page 23  |  Page 24  |  Page 25  |  Page 26  |  Page 27  |  Page 28  |  Page 29  |  Page 30  |  Page 31  |  Page 32  |  Page 33  |  Page 34  |  Page 35  |  Page 36  |  Page 37  |  Page 38  |  Page 39  |  Page 40  |  Page 41  |  Page 42  |  Page 43  |  Page 44  |  Page 45  |  Page 46  |  Page 47  |  Page 48