Listed buildings
www.heatingandventilating.net
Right solution for writing hub
The National Centre for Writing, which has just completed a £2 million extension and refurbishment project at its headquarters in Norwich, called upon the capabilities of the latest Priva BMS (building management system) as a vital part of the upgrade. By installing Priva Blue ID technology to monitor and control the internal climate, the organisation hopes to ensure that the building’s fabric, which includes ancient timber beams, is preserved in an optimum way
significant historic interest. In such a building, factors such as humidity can have an extremely detrimental and compromising effect on the internal structure. With this fact in mind, and the knowledge that the building’s existing BMS was reaching the end of its life and becoming unreliable, the decision was taken to invest in Priva technology. Although Dragon Hall, the Great Hall of which was
S
built in 1430, is a befitting home for such a prestigious organisation as the National Centre for Writing, there is a constant need to ensure that the building is both fit for purpose and properly preserved for the future. With this in mind, permission was sought to upgrade the property.
Lottery funding
As a literature development agency, the National Centre for Writing has a long track record of success, even leading the bid for Norwich to be granted the UNESCO City of Literature title in 2012 – the first such accolade in England. Recognising the need for the organisation to continue its good work, £789,434 from National Lottery sources was granted by the Arts Council England to support the upgrade project’s capital costs. The aim was to integrate new educational and community spaces, enhanced office space and technical facilities, a refurbished public performance arena seating up to 120 people, and residential space for visiting writers. Clearly, as part of such a major innovation, the opportunity arose to optimise the climate control for both occupant comfort and building preservation. The existing building was served with an ageing BMS prone to reliability issues. To address the situation, Norwich-based Electrical and Mechanical Controls (EMC), a long-standing Priva partner, was appointed to the project. “We were involved with installing a heating
system in a previous glass extension at Dragon Hall back in 2005,” says Dan Millard, technical operations Manager at EMC. “The extension incorporated office
June 2019
space and a new plant room, and this successful experience helped us secure the new contract.” This time around, however, the list of demands
was much longer as it involved the renovation of a structure that is one of the famed ‘Norwich 12’ iconic buildings. Dragon Hall, which is renowned for its spectacular timber crown-post roof and intricately carved dragon, is symbolic of Norwich as a city of historic national importance.
Building conservation
“Energy saving wasn’t the primary driver for this project,” states Dan. “Conservation of the Grade I listed building was the main concern. Dragon Hall incorporates a lot of old timber and it is therefore vital to ensure the climatic conditions are right, for example – keeping an eye on the humidity to ensure the beams don’t degrade.” The existing BMS, as well as being unreliable,
suffered from both poor usability and operability, being described as “fiddly and not user friendly”. Upgrading the system in terms of better control and easier maintenance, was thus a priority. “Priva is our BMS manufacturer of choice due to
the products being reliable and cost effective,” says Mr Millard. “We deployed Priva controllers for the main panel at Dragon Hall, utilising Priva Blue ID C4 controllers that interfaced with the Mitsubishi air conditioning system via BACnet. We also used the Priva cloud connection (TC Manager Connect) to integrate the new wing with the rest of the building.”
ince 2015, the National Centre for Writing has been based at Dragon Hall, a Grade I listed, 15th-century medieval trading hall of
Meticulous planning
At all stages of the project, EMC needed to be mindful in terms of minimising any disruption to building’s day-to-day operations. As well as hosting the National Centre for Writing, an organisation called the Dragon Hall Heritage Volunteers acts as tour guide to the building, which is also home to a museum.
Couple this task with the priority of not
compromising the building’s structural fabric, and the size of the challenge is plain to see. The historical significance of Dragon Hall cannot be overstated; although the Great Hall on the first floor was built in the 15th Century, some parts of the site are much older. In fact, archaeological research shows evidence of a Saxon building beneath the hall that was erected around the year 1,000. “From a planning point of view, care was needed
with regard to what we mounted on the walls,” says Dan. “With this in mind, the sensors used had to be visually in keeping with the rest of the Grade I listed building.” The upgraded and extended Dragon Hall was opened in June 2018, and the end user is reporting complete satisfaction with the new BMS. Moving forward, more benefits are anticipated. “Over time, Dragon Hall may see cost savings as
the Priva BMS is more efficient and reliable than the system it replaced,” concludes Dan.
www.heatingandventilating.net
Page 1 |
Page 2 |
Page 3 |
Page 4 |
Page 5 |
Page 6 |
Page 7 |
Page 8 |
Page 9 |
Page 10 |
Page 11 |
Page 12 |
Page 13 |
Page 14 |
Page 15 |
Page 16 |
Page 17 |
Page 18 |
Page 19 |
Page 20 |
Page 21 |
Page 22 |
Page 23 |
Page 24 |
Page 25 |
Page 26 |
Page 27 |
Page 28 |
Page 29 |
Page 30 |
Page 31 |
Page 32 |
Page 33 |
Page 34 |
Page 35 |
Page 36 |
Page 37 |
Page 38 |
Page 39 |
Page 40 |
Page 41 |
Page 42 |
Page 43 |
Page 44 |
Page 45 |
Page 46 |
Page 47 |
Page 48 |
Page 49 |
Page 50 |
Page 51 |
Page 52 |
Page 53 |
Page 54 |
Page 55 |
Page 56