www.heatingandventilating.net
BOILER UPGRADE DELIVER A
from an energy boost after a new heating Scarborough nursing home is benefitting
escalating bills while its 30 residents complained Care Homes Group – was struggling to manage Rambla Nursing Home – part of the Complete system was installed.
Sime looking for a complete overhaul following an Maintenance manager Ken Harrison contacted that it was either too hot or too cold.
storage heaters alone making the building The home had previously been managing with examination of the existing technology.
expensive to heat with inconsistent temperature.
residents to remain in-situ throughout and there The three-month fitting process allowed installed between June 2018 and September 2018. suggested a Murelle Equipe HE 70kW which was Sime installer Tony Buglass (pictured right)
Murelle Equipe HE 70 kW boiler and fitting four thermostatic radiator valves (TRVs), the new fittings, 50 new radiators with energy efficient from scratch. This involved new pipework and installing a gas heating and hot water solution The job included removing the old system and wasminimumdisruption to their daily routines.
throughout the building by dividing the home into Tony’s design allowed temperature variations heating controls.
four heating zones – with controls in each zone to boost or reduce heating as and when required.
running the facility have halved. hot water system, the costs of energy-efficient gas heating and bills. In fact, as a result of the new considerable savings on heating The result has been
Tony said: “The newheating
ensure maximum energy efficiency system has been designed to
wh
hile ensuring better temperature regulation for the different areas of the Mu
cho gre
hom me of this size.
Ken said the introduction of the boiler sy transformed life for the residents of the c H
imp cha gre effi pur we
rpose and size of the building.We ne re functional, but were not really sui
He said: “The storage heaters we had pr
eded a more table for the d previously care home. r system had
perative that the installation of the new heating ange was a big undertaking for us an eater flexibility of temperature contro fficient gas heating system that allowe
ew heating nd it was ol. Such a ed for
eat outputs at a cost-effective price fo oice for me as it is energy efficient an urelle Equipe ErP was the natural e building. The 70kW Sime W Sime
Heating systems RS ENERGY BOOST
carefullymanaged stages.We are completing the installation in any inconvenience to themby Tony did a fantastic job of minimising system did not disrupt our residents.
system and I am confident that it will delighted with the new heating
deliver savings to our energy bills in
Sime domestic and commercial the long-term.
environmentally-efficient heating and boilers deliver intelligent and
hot water solutions. All Murelle Equipemodular system
nd delivers or a care
said to be character The combustion o
ms are equipped with 35, 50, 70 or 110 kW condenser coil exchangers,
vapour, which in trad
stainless steel, whic heat with the main e modular systems al chimney. The techno the outside through
possible heat excha Its cylindrical sha of the condensate.
condensate.
lows for the recovery of this ology used in Murelle Equipe the release of heat from the ditional boilers is conveyed to of methane generates water rised by high yield.
ch resists the corrosive action exchanger constructed of
ape is said to ensure the best nge and collection of
no Ne
ot long lead times. eed next-day deliv
leve day sup
very, .
els mean we can deliver 95% of f products next day or offer sam y and timed delivery services. These levels also allow us to pport and supplement our distrib
f
hese levels also allow us to butors stock holding, which in
manufacturers, ensuring the job is completed on time every time.
me
Ask for Albion.
or
#askforAlbion
www.albionvalvesuk.c com Specialist Suppliers of Industrial and Building Services V ers of Industrial and Building Services V Valves
Page 1 |
Page 2 |
Page 3 |
Page 4 |
Page 5 |
Page 6 |
Page 7 |
Page 8 |
Page 9 |
Page 10 |
Page 11 |
Page 12 |
Page 13 |
Page 14 |
Page 15 |
Page 16 |
Page 17 |
Page 18 |
Page 19 |
Page 20 |
Page 21 |
Page 22 |
Page 23 |
Page 24 |
Page 25 |
Page 26 |
Page 27 |
Page 28 |
Page 29 |
Page 30 |
Page 31 |
Page 32 |
Page 33 |
Page 34 |
Page 35 |
Page 36 |
Page 37 |
Page 38 |
Page 39 |
Page 40 |
Page 41 |
Page 42 |
Page 43 |
Page 44 |
Page 45 |
Page 46 |
Page 47 |
Page 48 |
Page 49 |
Page 50 |
Page 51 |
Page 52 |
Page 53 |
Page 54 |
Page 55 |
Page 56