search.noResults

search.searching

note.createNoteMessage

search.noResults

search.searching

orderForm.title

orderForm.productCode
orderForm.description
orderForm.quantity
orderForm.itemPrice
orderForm.price
orderForm.totalPrice
orderForm.deliveryDetails.billingAddress
orderForm.deliveryDetails.deliveryAddress
orderForm.noItems
www.heatingandventilating.net


District heating


AMBITIOUS DISTRICT GROUND SOURCE SYSTEM S


pecialist in domestic district ground source heat pump systems, Kensa Contracting, has secured the contract to deliver what’s claimed to be England’s largest shared ground loop heat pump system with ENGIE. A total of 400 flats over eight tower blocks in the London borough of Enfield will be retrofitted with Shoebox heat pumps manufactured by Kensa Contracting’s sister company Kensa Heat Pumps, and connected to the largest collection of district arrays of its kind. Planned for completion in October this year, the heating upgrade will result


in residents’ energy bills being reducing by 30-50%. Dr Matthew Trewhella, Kensa’s Contracting director comments: “This


project is an excellent example of how district heating can be rolled out using the shared ground loop system architecture. “One of the great strengths of this system type is its flexibility and


scalability. Shared ground loop systems can be featured in developments of just two properties (micro-district) whilst this project clearly demonstrates how the concept can be scaled up to much larger systems. “Not only do ground source heat pumps provide the lowest cost heat, they also deliver substantial carbon savings, and landlords benefit from the exceptionally low servicing and maintenance costs.” The district ground source heat network system at Enfield will feature 16


shared ground loop systems serving the eight tower blocks. Each district system will typically consist of clusters of eight boreholes serving individual heat pumps installed within the flats of half a tower block. This system architecture allows each resident to select their own


preferred energy supplier to access the best available electricity tariff. The shared nature of the ground array design also reduces drilling costs – typically the most cost-prohibitive aspect of a ground source heat pump installation – and ensures funding through the Energy Company Obligations


A borehole drilling rig at the London borough of Enfield where 400 flats will be retrofitted with Kensa’s Shoebox heat pumps


(ECO) Scheme as well as the Government’s Non-Domestic Renewable Heat Incentive (RHI), securing Enfield Council quarterly payments for 20 years. With typically two thirds of the heating sourced from the ground, the


borehole installations will provide an infrastructure which will deliver an affordable heat and hot water solution for the Enfield tower blocks for generations.


Drilling of the boreholes has already commenced with one site’s groundworks planned for completion before the end of the year.


BIG IT UP WITH MARFLOW HYDRONICS


Large PICVs for large line sizes.


Find out more at


 


www.heatingandventilating.net


For help with your next water   or email 


February 2018


19


Page 1  |  Page 2  |  Page 3  |  Page 4  |  Page 5  |  Page 6  |  Page 7  |  Page 8  |  Page 9  |  Page 10  |  Page 11  |  Page 12  |  Page 13  |  Page 14  |  Page 15  |  Page 16  |  Page 17  |  Page 18  |  Page 19  |  Page 20  |  Page 21  |  Page 22  |  Page 23  |  Page 24  |  Page 25  |  Page 26  |  Page 27  |  Page 28  |  Page 29  |  Page 30  |  Page 31  |  Page 32  |  Page 33  |  Page 34  |  Page 35  |  Page 36  |  Page 37  |  Page 38  |  Page 39  |  Page 40  |  Page 41  |  Page 42  |  Page 43  |  Page 44  |  Page 45  |  Page 46  |  Page 47  |  Page 48