BSEE Advertorial


INSTALLATION NEWS SPONSORED BY


Orient Express depot gets on board with radiant heating


Stewarts Lane railway depot in Baersea has provided maintenance and stabling for the South East of England’s rolling stock since 1862. Having stabled the Royal Train, maintenance of the presgious Orient Express now takes place at the depot. Nortek Global HVAC answered the call to provide the most eecve and economic heang soluon under the Reznor brand.


A


fter the installation of a Nor-Ray-Vac system in the high bay and main locomotive shed at Orient Express 28


years ago, the system needed to be replaced. Orient Express approached Multigas and asked it to assist with the replacement of the existing and additional two areas that were previously unheated.


Entrance and exit doors often occupy the full width of the building and may be left open for many hours a day. When doors are open at both ends, a wind tunnel effect is created, with cold air at high velocity is drawn into the shed. Keeping the shed warm enough for employees to work comfortably is compounded by the often north-south alignment of the tracks, which allows very little sunshine to warm the interior. Nortek Global HVAC were able to offer the ideal heating and most effective and economic heating solution under the Reznor brand. Blanket heat coverage was not a necessity in the rail shed, as only the areas where personnel work needed to be heated. When operatives are working on one part of the train, zoning enables all other parts of the radiant heating system to be switched off. Over


Technical summary Phase one


Area: 41m long x 15m wide Height: 7m


Volume: 4305m3


Heaters: 6 x 24kW NRV burners with one flue discharge


Phase two


Area: 30m long x 15m wide Height: 7m


Volume: 3150m3


Heaters: 6 x 18kW NRV burners with one flue discharge


Phase three – High Bay Area: 30m long x 20m wide Height: 12m Volume: 7200m3


Heaters: 10 x 18kW NRV burners with one flue discharge


Phase three – Main Loco Shed Area: 77m long x 15m wide Height: 7m


Volume: 8085m3


Heaters: 18 x 18kW NRV burners with two flue discharge


36 BUILDING SERVICES & ENVIRONMENTAL ENGINEER APRIL 2018


time this produces considerable fuel economies and cost reductions. Economy and effectiveness were the two key criteria to be met when selecting the heating system for the rail maintenance shed. Finding a solution to both in a single heating system can be challenging. One form of space heating technology – ideally suited to this cold and inhospitable working environment – is the Nor-Ray-Vac radiant tube heating system.


Financial benefits


Reznor replaced the old system with the latest Nor-Ray-Vac series system, which was happily received by the client due to the past financial benefits of this type of heating system within a train depot environment.


The project was completed in three stages. Phases One and Two are where the complete rebuild of the carriages takes place for the Orient Express trains. These were previously unheated bays. Phase One, an area of 41 x 15m and 7m high saw the installation of a Nor-Ray-Vac system consisting of six 24kW burners with one flue discharge. Phase Two, an area of 30 x 15m and 7m high saw the installation of a Nor-Ray- Vac system consisting of 6 x 18kW burners with one flue discharge. Phase Three was the high bay and main locomotive shed where the steam locomotives are maintained on a regular basis. The Nor-Ray-Vac system was an exact replacement of the original to minimise the installation costs.


Radiant heang


The client was more than happy to replace the old system with the latest NRV series having experienced the financial benefits of an efficient radiant heating system within a train depot environment. In the high bay area of 30 x 20m and 12m high a Nor-Ray-Vac system of 10 x 18kW burners with one flue discharge was installed going around the perimeter of the bay, below the crane beam.


The main locomotive area of 77 x 15m and 7m high received a Nor-Ray-Vac system consisting of 18 x 18kW burners arranged in three zones with two flue discharges.


The Nor-Ray-Vac system combusts the fuel at the point of use enabling maximum efficiency with no distribution losses and has rapid response to changed conditions. It is uniquely designed to accommodate the


building constraints and required zoning for the method of working within the shed. The flexibility of the radiant heating system meant that specific areas can be heated as required by the work patterns within the shed, keeping staff warm.


The client employed the services of Multigas to undertake the complete new and replacement works. Orient Express now benefits from a radiant heating system capable of maintaining the depot at a comfortable environment well into the late 2030s.


www.nortekhvac.com


Installation summary


uVenice Simplon Orient Express invested in a Nor-Ray-Vac continuous radiant tube heating system.


uSuspended from the roof, the continuous radiant tube heating system emits infra-red rays that warm only objects and people in their path.


uLow operating costs are achieved by concentrating the heat at low level.


uA heating system with flexibility in design – tailored to the exact requirements of the design brief.


uNo movement of air – thus, dust and airborne particles are not moved around.


uNo distribution losses – fuel utilised at the point of use. VISIT OUR WEBSITE: www.bsee.co.uk


Page 1  |  Page 2  |  Page 3  |  Page 4  |  Page 5  |  Page 6  |  Page 7  |  Page 8  |  Page 9  |  Page 10  |  Page 11  |  Page 12  |  Page 13  |  Page 14  |  Page 15  |  Page 16  |  Page 17  |  Page 18  |  Page 19  |  Page 20  |  Page 21  |  Page 22  |  Page 23  |  Page 24  |  Page 25  |  Page 26  |  Page 27  |  Page 28  |  Page 29  |  Page 30  |  Page 31  |  Page 32  |  Page 33  |  Page 34  |  Page 35  |  Page 36  |  Page 37  |  Page 38  |  Page 39  |  Page 40  |  Page 41  |  Page 42  |  Page 43  |  Page 44  |  Page 45  |  Page 46  |  Page 47  |  Page 48  |  Page 49  |  Page 50