10% less structural steel than festoon systems. They also need about 800 millimeters (mm) of system height compared to the 5,000 mm required by festoon systems in a 100-meter application. Thanks to their efficient, compact design, e-chain systems can operate in confined installations. Dynamic. Cable festoon systems tend to reach their limits at speeds of 240 meters per minute (m/min) and accelerations exceeding 0.8 meters per second squared (m/sec2). On the other hand, modular e-chain systems can be operated at speeds over 600 m/min and with an acceleration over 2 m/sec2. Ease of installation and maintenance. Unlike labor-intensive and downtime- prone festoon and busbar systems, e-chain systems are virtually maintenance-free and can run for years without an issue. Due to their modular nature, they also make it easy to replace or add cables without having to overhaul the entire cable management system. In addition, e-chain systems offer easy side-mounting capabilities for girder cranes and indoor hoists via the Guidefast steel trough system, saving up to 80% installation time. Safe, secure cable guidance. In e-chain systems, cables are safely guided in the energy chain and can’t get caught on the crane structure unlike the cables in festoon systems. And, whereas busbars expose bare-loaded conductors to potentially hazardous plant conditions, e-chain systems incorporate standard electrical cables that are insulated from the surrounding environment. For particularly hazardous locations, e-chain cables are even available in a special electrostatic discharge (ESD) material, further increasing operational safety. Flexible and easy to customize. Modular cable carriers are easy to customize according to their application. For example, they offer many mounting options — on the side or top of the crane, for example — while their Extension Link feature enables operators to add an additional link, which is connected to the two outer bands via crossbars. This Extension Link increases the possible load capacity of an E4 e-chain series. The e-chain systems also come in many versions depending on the crane application, including small and lighter- weight energy chains, long-travel and heavy-duty energy chains and closed versions to protect cables from debris, and


“smart” energy chains with self-monitoring and breakage-detection capabilities.


ENERGY CHAINS IN ACTION: RETROFITTING THE PORT OF VIRGINIA Energy chains provide an efficient, hassle-free cable management system for transferring power, control and fiber optic cables from a fixed point to a moving point. In ship to shore (STS) cranes, they transfer cables from the crane structure to the moving trolley itself. These applications have their own set of demands, requiring reliable cable management systems that eliminate unnecessary maintenance and downtime in modern container ports. When it comes to traditional festoon


systems, a damaged trolley wheel or other component will cause the entire system to fail, having ripping effects throughout the port. Technicians will need to stop unloading the ship, fix the broken festoon system and then get the crane up and running again so that the ship can travel to its next port of call once it’s fully unloaded. In addition, the vessel windows at container ports are tighter than ever. Vessel lines need to get in and out of the berth and unload the containers as quickly as possible. At the same time, the terminal operators need to keep the berth full at all times; as soon as one ship has finished, it’s time for another ship to take its place. Any delay will therefore cost a significant amount of money for the ships — not to mention all the logistical headache. For these reasons, energy chain systems


have emerged as a reliable alternative to many festoon systems in container ports. In fact, the first e-chain installed on a North American STS crane was at the


Port of Virginia. Prior to implementing the e-chain system, the port’s festoon cables constantly swung into and tugged on each other, placing tension on the cables that eroded the cables’ health. Repairing the large, dangling cables 200 feet into the air also put personnel in a precarious situation. Overcoming these challenges, igus


retrofitted the festoon system with an e-chain system. This process involved fabricating steel brackets and beams that would be installed onto the girder, as well as platforms that would enable technicians to access the energy chain once it was installed. The technicians also set up the trough on the brackets and installed the chain. With assistance from a crane company, the technicians brought the chain up and pulled it through the trough. From there, they anchored down the fixed-end and installed the moving end to the tow arm. Igus also performed full test runs to ensure the system ran smoothly. Since this successful application at the


Port of Virginia, many STS crane companies have since seen the value of the energy chain system as a reliable, maintenance-free cable management system that can keep up with the demands of modern ports.


POSITION YOURSELF FOR THE FUTURE — TODAY Cable reels, festoon systems, busbar systems and other traditional crane cable solutions make it difficult to add or reconfigure components, keeping them a step behind ever-advancing IIoT and automation technologies. The right cable management system, however, is adaptable and can provide you with the flexibility you need to take advantage of new technologies while maintaining a competitive edge.’


Dockside Lift & Move Supplement | October 2024 | xi


Page 1  |  Page 2  |  Page 3  |  Page 4  |  Page 5  |  Page 6  |  Page 7  |  Page 8  |  Page 9  |  Page 10  |  Page 11  |  Page 12  |  Page 13  |  Page 14  |  Page 15  |  Page 16  |  Page 17  |  Page 18  |  Page 19  |  Page 20  |  Page 21  |  Page 22  |  Page 23  |  Page 24  |  Page 25  |  Page 26  |  Page 27  |  Page 28  |  Page 29  |  Page 30  |  Page 31  |  Page 32  |  Page 33  |  Page 34  |  Page 35  |  Page 36  |  Page 37  |  Page 38  |  Page 39  |  Page 40  |  Page 41  |  Page 42  |  Page 43  |  Page 44  |  Page 45  |  Page 46  |  Page 47  |  Page 48  |  Page 49  |  Page 50  |  Page 51  |  Page 52  |  Page 53  |  Page 54  |  Page 55  |  Page 56  |  Page 57  |  Page 58  |  Page 59  |  Page 60  |  Page 61  |  Page 62  |  Page 63  |  Page 64  |  Page 65  |  Page 66  |  Page 67  |  Page 68  |  Page 69  |  Page 70  |  Page 71  |  Page 72  |  Page 73  |  Page 74  |  Page 75  |  Page 76  |  Page 77  |  Page 78  |  Page 79  |  Page 80  |  Page 81  |  Page 82  |  Page 83  |  Page 84  |  Page 85  |  Page 86  |  Page 87  |  Page 88  |  Page 89  |  Page 90  |  Page 91  |  Page 92  |  Page 93  |  Page 94  |  Page 95  |  Page 96  |  Page 97  |  Page 98  |  Page 99