IN DESIGN


Aerial perspective


CONSTRUCTION CHALLENGE The existing MRT tunnel is passing across the site to connect to Sengkang MRT Depot, and this has reduced the basement footprint and buildability. Occupying only about 36 per cent of the overall site area, this has to be thoroughly planned to cater to all car parking and M&E spaces for the podium. The proximity to the existing MRT tunnel also poses a challenge to the structural design and construction. The architects have to minimise disturbance in terms of vibration, settlement and structural integrity. The solution is then to design long- span ground beams spanning between piles along the tunnel, and to locate these at least 3 metres away from the tunnel’s outermost surface. Loading from the columns above, the tunnel could then be redistributed accordingly and the piles within the underground influence zone could be de-bonded.


UNIVERSAL DESIGN MARK. The design functionality has gone through reviews with


100


BCA and attained the BCA Universal Design Mark GoldPlus Award. Users were involved in establishing the design needs, and their needs have been translated through the provision of effective way-finding and inclusive facilities, such as adequate seating in public spaces and outdoor areas with good walkability. The design has also considered the site’s height difference of 1.5 metres and the architects will make sure that access to all facilities is barrier-free and disabled- friendly.


The BCA has also reviewed the submission of design for maintainability scheme, aiming to minimise carbon footprint and operation costs. For example, there will be an automated irrigation system at the MRT Green roof; fixed maintenance- aid provisions; and articulating boom lift, temporary suspended working platform and mobile scaffold to maintain the non- residential façade.


Page 1  |  Page 2  |  Page 3  |  Page 4  |  Page 5  |  Page 6  |  Page 7  |  Page 8  |  Page 9  |  Page 10  |  Page 11  |  Page 12  |  Page 13  |  Page 14  |  Page 15  |  Page 16  |  Page 17  |  Page 18  |  Page 19  |  Page 20  |  Page 21  |  Page 22  |  Page 23  |  Page 24  |  Page 25  |  Page 26  |  Page 27  |  Page 28  |  Page 29  |  Page 30  |  Page 31  |  Page 32  |  Page 33  |  Page 34  |  Page 35  |  Page 36  |  Page 37  |  Page 38  |  Page 39  |  Page 40  |  Page 41  |  Page 42  |  Page 43  |  Page 44  |  Page 45  |  Page 46  |  Page 47  |  Page 48  |  Page 49  |  Page 50  |  Page 51  |  Page 52  |  Page 53  |  Page 54  |  Page 55  |  Page 56  |  Page 57  |  Page 58  |  Page 59  |  Page 60  |  Page 61  |  Page 62  |  Page 63  |  Page 64  |  Page 65  |  Page 66  |  Page 67  |  Page 68  |  Page 69  |  Page 70  |  Page 71  |  Page 72  |  Page 73  |  Page 74  |  Page 75  |  Page 76  |  Page 77  |  Page 78  |  Page 79  |  Page 80  |  Page 81  |  Page 82  |  Page 83  |  Page 84  |  Page 85  |  Page 86  |  Page 87  |  Page 88  |  Page 89  |  Page 90  |  Page 91  |  Page 92  |  Page 93  |  Page 94  |  Page 95  |  Page 96  |  Page 97  |  Page 98  |  Page 99  |  Page 100  |  Page 101  |  Page 102  |  Page 103  |  Page 104  |  Page 105  |  Page 106  |  Page 107  |  Page 108  |  Page 109  |  Page 110  |  Page 111  |  Page 112