THE MAGAZINE FOR THE DRAINAGE, WATER & WASTEWATER INDUSTRIES


SPECIAL WORKS


study for the English Cricket Board."


He added: "Graf are now our go-to supplier for below-ground rainwater harvesting systems."


Josh Knappett, facilities and projects lead for MCCC, said that despite the exceptionally wet season, Chiswick CC and Middlesex Cricket wanted to learn what impact a rainwater harvesting system with below ground storage would have on cricket clubs in London as many are facing extremes of climate conditions, alongside increasing water mains costs.


"We hope that by the end of the summer we will have a better understanding of Chiswick Cricket Club's use of rainwater versus mains water on the maintenance of their grounds and on playing conditions. Anything we can do to support a cricket club, we will do," he said.


As well as rainwater, the Platin XL recycled and recyclable plastic tank is designed to accommodate substances such as wastewater, raw sewage, effluent, silage, slurry, greywater and bluewater. This makes it an excellent choice for


applications including firefighting.


Its adjustable lid height allows for flush alignment with ground level, ensuring the tank fits seamlessly into its surroundings. Additionally, the rotating tank dome aids in aligning connecting lines, simplifying the installation process even further, and an optional vehicle loading lid, which is ideal for installation under drivable surfaces like driveways or parking lots, allows the tanks to handle significant loads, ensuring durability and safety in high-traffic areas.


Polypipe Building Services helps transform former London bus depot


Polypipe Building Services secured an order for more than 4,000 prefabricated drainage stacks to help transform an historic London site which is being redeveloped by Telford Homes.


Mechanical and electrical contractor I-MEX (M&E) Ltd selected Terrain FUZE Stax for the Alperton Bus Depot site, a mixed-use development in Brent comprising of three high-rise blocks of commercial, residential, and affordable housing providing 461 homes. The development is due to be completed by June 2025.


Terrain FUZE Stax significantly reduces installation times in large-scale drainage stack projects. This is because as a prefabricated solution covering the most common configurations of kitchens, bathrooms, and utility rooms, it removes the time spent on repetitive cutting and welding jobs or assembling loose components.


Being available to order through distributors meant I-MEX (M&E) Ltd were able to order product and have it delivered within a month of them starting work on site.


Robert Bruce, Polypipe Building Services Technical Sales Manager for London, said: “I- MEX (M&E) Ltd were looking for a versatile drainage stack, and liked the fact that Terrain FUZE Stax offers two four-way bosses on the same stack and can be used in


FOLLOW US multiple situations.


“The fast turnaround needed to keep up with the build program made Terrain FUZE Stax an ideal choice because we keep these in stock with our distributors so there’s a short lead time.


“We also worked out a complete delivery schedule with them which means their installation team can call down so many floors for delivery to site at a time through their distributor as they need them.


“The fact Stax come in two parts makes them easy to install, especially where fire collars are already fitted into the slab. Previously I-MEX (M&E) Ltd had been cutting stacks in two to fit them then fabricate them back together.


“Now they are installing Stax so quickly at a level per day that we’ve had to speed up their delivery schedule. Our Advantage team has also helped adapt the Terrain FUZE Stax being used in the bathrooms because I-MEX (M&E) Ltd needed a ring seal fitting to one of the outlets.”


To give the installation team complete peace of mind Polypipe Building Services were able to conduct a site visit to check the standard of the drainage product installation and produce a report for I-MEX (M&E) Ltd to present to Telford Homes. This is increasingly being requested by


responsible contractors from construction product manufacturers following the implementation of the Building Safety Act.


Dan Smailes, Commercial Director Prefabrication at I-MEX (M&E) Ltd, said: “Prefabrication is at the forefront of what I- MEX (M&E) Ltd have been doing over the last seven years, and the introduction of Polypipe FUZE Stax came at the perfect time for us to be able to utilise it on


this project.


“We have previously worked alongside Polypipe Building Services to complete traditional prefabrication pieces on other projects using their standard drainage stacks and had adjusted them to make installation easier, but moving forward we will continue to use the two-part FUZE Stax on all our sites.”


October 2024 | 59


Page 1  |  Page 2  |  Page 3  |  Page 4  |  Page 5  |  Page 6  |  Page 7  |  Page 8  |  Page 9  |  Page 10  |  Page 11  |  Page 12  |  Page 13  |  Page 14  |  Page 15  |  Page 16  |  Page 17  |  Page 18  |  Page 19  |  Page 20  |  Page 21  |  Page 22  |  Page 23  |  Page 24  |  Page 25  |  Page 26  |  Page 27  |  Page 28  |  Page 29  |  Page 30  |  Page 31  |  Page 32  |  Page 33  |  Page 34  |  Page 35  |  Page 36  |  Page 37  |  Page 38  |  Page 39  |  Page 40  |  Page 41  |  Page 42  |  Page 43  |  Page 44  |  Page 45  |  Page 46  |  Page 47  |  Page 48  |  Page 49  |  Page 50  |  Page 51  |  Page 52  |  Page 53  |  Page 54  |  Page 55  |  Page 56  |  Page 57  |  Page 58  |  Page 59  |  Page 60  |  Page 61  |  Page 62  |  Page 63  |  Page 64  |  Page 65  |  Page 66  |  Page 67  |  Page 68  |  Page 69  |  Page 70  |  Page 71  |  Page 72