search.noResults

search.searching

saml.title
dataCollection.invalidEmail
note.createNoteMessage

search.noResults

search.searching

orderForm.title

orderForm.productCode
orderForm.description
orderForm.quantity
orderForm.itemPrice
orderForm.price
orderForm.totalPrice
orderForm.deliveryDetails.billingAddress
orderForm.deliveryDetails.deliveryAddress
orderForm.noItems
WATER PAGES


Bluesky 3D building models drive efficiency and collaboration in water


construction


MWHTreatment is using the latest 3D computer modelling technology to improve the delivery of major construction projects across the UK. Created by aerial mapping company Bluesky International, models are used throughout the lifecycle of projects; from the production of animations at the concept stage right through to Virtual Reality (VR) simulations for health and safety training.


Derived from the most up to date and accurate aerial photography the 3D models are helping MWHTreatment drive efficiency and collaboration and have already been used on a number of developments including the Winchburgh upgrade works for Scottish Water and Thames Gateway Desal upgrade for Thames Water.


“The Bluesky 3D models provide us with a crucial understanding of locations we are working in,” commented Stephen Kennedy, Head of Digital & Innovation atMWHTreatment. “They provide initial site intelligence and inform true visualisations for our Visual Project Initiation activities - part of the concept and planning stage of most projects. We also use the 3D detail to facilitate collaboration, concept design and planning and, by taking the data into other platforms, as the basis of our design.”


A leading Design and Build water sector solution provider with a 200-year legacy,MWHTreatment converts and incorporates the Bluesky models into a range of software packages including gaming, engineering and collaborative planning solutions. The data creates the project backdrop,


38


providing context for animations and interactive applications. Reducing the processing time and manual resource required to create sites features such as trees, building and roads, sections of the Bluesky models can also be removed or enhanced to incorporate new design and survey information.


“The final outputs of the Bluesky models are integrated with our digital tools to enhance workflows including animations, still images, 3D CAD models and interactive applications and VR experiences. Used to engage the engineering and construction teams, as well as the client, at key stages this drives efficiency and promotes


safe systems of working and collaboration,” added Clare Kovacs, National Rehearsal Lead, at MWHTreatment. “The Bluesky models are cost effective and easy to acquire and the team behind them is approachable, efficient and helpful with a dedicated point of contact.”


Photogrammetrically derived from stereoscopic aerial photography, the Bluesky models are fully rendered and are provided as either wireframe or block models in a format suitable for use in both CAD and GIS software. All Bluesky 3D models are supplied complete with a Digital Terrain Model (DTM) depicting the topography of the underlying surface.


Safeguarding future water supplies and protecting the Environment


The Environment Agency has launched a four-week consultation (11 February) to determine areas of water stress in England, and how best to protect the environment and safeguard supplies. Climate change, population growth and the need to improve our resilience to droughts are all putting pressure on water supplies in areas of England.


| March 2021 | www.draintraderltd.com


Today’s consultation will provide up-to-date evidence on water resources so that water companies experiencing the most severe pressures adopt the highest level of water- saving measures, helping to manage supplies in the future and ensure our rivers, lakes and streams are protected.


Seven additional water company areas – Severn Trent Water, South Staffordshire Water,


Page 1  |  Page 2  |  Page 3  |  Page 4  |  Page 5  |  Page 6  |  Page 7  |  Page 8  |  Page 9  |  Page 10  |  Page 11  |  Page 12  |  Page 13  |  Page 14  |  Page 15  |  Page 16  |  Page 17  |  Page 18  |  Page 19  |  Page 20  |  Page 21  |  Page 22  |  Page 23  |  Page 24  |  Page 25  |  Page 26  |  Page 27  |  Page 28  |  Page 29  |  Page 30  |  Page 31  |  Page 32  |  Page 33  |  Page 34  |  Page 35  |  Page 36  |  Page 37  |  Page 38  |  Page 39  |  Page 40  |  Page 41  |  Page 42  |  Page 43  |  Page 44  |  Page 45  |  Page 46  |  Page 47  |  Page 48  |  Page 49  |  Page 50  |  Page 51  |  Page 52  |  Page 53  |  Page 54  |  Page 55  |  Page 56  |  Page 57  |  Page 58  |  Page 59  |  Page 60  |  Page 61  |  Page 62  |  Page 63  |  Page 64  |  Page 65  |  Page 66  |  Page 67  |  Page 68  |  Page 69  |  Page 70  |  Page 71  |  Page 72  |  Page 73  |  Page 74  |  Page 75  |  Page 76  |  Page 77  |  Page 78  |  Page 79  |  Page 80